JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for WEPOTK004: Status and Upgrade Plan of the MR Ring RF Systems in J-PARC

@inproceedings{hasegawa:ipac2022-wepotk004,
  author       = {K. Hasegawa and K. Hara and M. Nomura and C. Ohmori and H. Okita and T. Shimada and Y. Sugiyama and F. Tamura and M. Yamamoto and M. Yoshii},
% author       = {K. Hasegawa and K. Hara and M. Nomura and C. Ohmori and H. Okita and T. Shimada and others},
% author       = {K. Hasegawa and others},
  title        = {{Status and Upgrade Plan of the MR Ring RF Systems in J-PARC}},
  booktitle    = {Proc. IPAC'22},
% booktitle    = {Proc. 13th International Particle Accelerator Conference (IPAC'22)},
  pages        = {2031--2033},
  eid          = {WEPOTK004},
  language     = {english},
  keywords     = {cavity, operation, power-supply, proton, experiment},
  venue        = {Bangkok, Thailand},
  series       = {International Particle Accelerator Conference},
  number       = {13},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {07},
  year         = {2022},
  issn         = {2673-5490},
  isbn         = {978-3-95450-227-1},
  doi          = {10.18429/JACoW-IPAC2022-WEPOTK004},
  url          = {https://jacow.org/ipac2022/papers/wepotk004.pdf},
  abstract     = {{The J-PARC Main Ring (MR) is a high intensity proton accelerator and delivers 30 GeV proton beams for the long-base line neutrino experiment and the hadron experiments. At present, the beam intensity supplied to the neutrino experiment reached 520 kW with a cycle time of 2.48 s. Toward the design beam power of 750 kW and future goal of 1.3 MW, we chose shortening the MR operation cycle. Accelerating time is shortened in order to shorten the cycle, so a high accelerating voltage is required. Therefore, it is necessary to upgrade the RF systems. This RF upgrade expands the current nine RF systems to a total of thirteen. We are planning to fabricate four RF power sources and add four additional cavities that are recombined with existing cavities. The present status and upgrade plan of the MR RF systems are reported.}},
}