JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


RIS citation export for MOPOPT040: Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign

TY  - CONF
AU  - Apollonio, A.
AU  - Andreassen, O.Ø.
AU  - Antoine, A.
AU  - Argyropoulos, T.
AU  - Bastos, M.C.
AU  - Bednarek, M.
AU  - Bordini, B.
AU  - Brodzinski, K.
AU  - Calia, A.
AU  - Charifoulline, Z.
AU  - Coelingh, G.-J.
AU  - D’Angelo, G.
AU  - Delikaris, D.
AU  - Denz, R.
AU  - Fiscarelli, L.
AU  - Froidbise, V.
AU  - Galilée, M.A.
AU  - Garnier, J.C.
AU  - Gorbonosov, R.
AU  - Hagen, P.
AU  - Hostettler, M.
AU  - Jacquet, D.
AU  - Le Naour, S.
AU  - Mirarchi, D.
AU  - Montabonnet, V.
AU  - Panev, B.I.
AU  - Persson, T.H.B.
AU  - Podzorny, T.
AU  - Pojer, M.
AU  - Ravaioli, E.
AU  - Rodriguez-Mateos, F.
AU  - Siemko, A.P.
AU  - Solfaroli, M.
AU  - Spasic, J.
AU  - Stanisz, A.
AU  - Steckert, J.
AU  - Steerenberg, R.
AU  - Sudak, S.
AU  - Thiesen, H.
AU  - Todesco, E.
AU  - Trad, G.
AU  - Uythoven, J.A.
AU  - Uznanski, S.
AU  - Verweij, A.P.
AU  - Vizziello, V.
AU  - Wenninger, J.
AU  - Willering, G.P.
AU  - Wollmann, D.
AU  - Yammine, S.
ED  - Zimmermann, Frank
ED  - Tanaka, Hitoshi
ED  - Sudmuang, Porntip
ED  - Klysubun, Prapong
ED  - Sunwong, Prapaiwan
ED  - Chanwattana, Thakonwat
ED  - Petit-Jean-Genaz, Christine
ED  - Schaa, Volker R.W.
TI  - Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign
J2  - Proc. of IPAC2022, Bangkok, Thailand, 12-17 June 2022
CY  - Bangkok, Thailand
T2  - International Particle Accelerator Conference
T3  - 13
LA  - english
AB  - In this contribution we provide a summary of the LHC hardware commissioning campaign following the second CERN Long Shutdown (LS2), initially targeting the nominal LHC energy of 7 TeV. A summary of the test procedures and tools used for testing the LHC superconducting circuits is given, together with statistics on the successful test execution. The paper then focuses on the experience and observations during the main dipole training campaign, describing the encountered problems, the related analysis and mitigation measures, ultimately leading to the decision to reduce the energy target to 6.8 TeV. The re-commissioning of two powering sectors, following the identified problems, is discussed in detail. The paper concludes with an outlook to the future hardware commissioning campaigns, discussing the lessons learnt and possible strategies moving forward.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 335
EP  - 338
KW  - MMI
KW  - dipole
KW  - operation
KW  - target
KW  - hardware
DA  - 2022/07
PY  - 2022
SN  - 2673-5490
SN  - 978-3-95450-227-1
DO  - doi:10.18429/JACoW-IPAC2022-MOPOPT040
UR  - https://jacow.org/ipac2022/papers/mopopt040.pdf
ER  -