BiBTeX citation export for MOPOPT040: Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign

@inproceedings{apollonio:ipac2022-mopopt040,
  author       = {A. Apollonio and O.Ø. Andreassen and A. Antoine and T. Argyropoulos and M.C. Bastos and M. Bednarek and B. Bordini and K. Brodzinski and A. Calia and Z. Charifoulline and G.-J. Coelingh and G. D’Angelo and D. Delikaris and R. Denz and L. Fiscarelli and V. Froidbise and M.A. Galilée and J.C. Garnier and R. Gorbonosov and P. Hagen and M. Hostettler and D. Jacquet and S. Le Naour and D. Mirarchi and V. Montabonnet and B.I. Panev and T.H.B. Persson and T. Podzorny and M. Pojer and E. Ravaioli and F. Rodriguez-Mateos and A.P. Siemko and M. Solfaroli and J. Spasic and A. Stanisz and J. Steckert and R. Steerenberg and S. Sudak and H. Thiesen and E. Todesco and G. Trad and J.A. Uythoven and S. Uznanski and A.P. Verweij and V. Vizziello and J. Wenninger and G.P. Willering and D. Wollmann and S. Yammine},
% author       = {A. Apollonio and O.Ø. Andreassen and A. Antoine and T. Argyropoulos and M.C. Bastos and M. Bednarek and others},
% author       = {A. Apollonio and others},
  title        = {{Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign}},
  booktitle    = {Proc. IPAC'22},
% booktitle    = {Proc. 13th International Particle Accelerator Conference (IPAC'22)},
  pages        = {335--338},
  eid          = {MOPOPT040},
  language     = {english},
  keywords     = {MMI, dipole, operation, target, hardware},
  venue        = {Bangkok, Thailand},
  series       = {International Particle Accelerator Conference},
  number       = {13},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {07},
  year         = {2022},
  issn         = {2673-5490},
  isbn         = {978-3-95450-227-1},
  doi          = {10.18429/JACoW-IPAC2022-MOPOPT040},
  url          = {https://jacow.org/ipac2022/papers/mopopt040.pdf},
  abstract     = {{In this contribution we provide a summary of the LHC hardware commissioning campaign following the second CERN Long Shutdown (LS2), initially targeting the nominal LHC energy of 7 TeV. A summary of the test procedures and tools used for testing the LHC superconducting circuits is given, together with statistics on the successful test execution. The paper then focuses on the experience and observations during the main dipole training campaign, describing the encountered problems, the related analysis and mitigation measures, ultimately leading to the decision to reduce the energy target to 6.8 TeV. The re-commissioning of two powering sectors, following the identified problems, is discussed in detail. The paper concludes with an outlook to the future hardware commissioning campaigns, discussing the lessons learnt and possible strategies moving forward.}},
}