KEKdownload RIS dataset for institute's DOIs
Ibaraki, Japan

DOI Title
10.18429/JACoW-IPAC2021-MOPAB069 Equilibrium Bunch Density Distribution with Multiple Active and Passive RF Cavities
10.18429/JACoW-IPAC2021-MOPAB091 Injection Section Upgrading with the Septum-Magnet Replacement in KEK-PF Ring
10.18429/JACoW-IPAC2021-MOPAB093 Operational Status of Photon Factory Light Sources
10.18429/JACoW-IPAC2021-MOPAB122 Present Status of HiSOR
10.18429/JACoW-IPAC2021-MOPAB162 The First Trial of XY-Coupled Beam Phase Space Matching for Three-Dimensional Spiral Injection
10.18429/JACoW-IPAC2021-MOPAB163 First Synchronous Measurement of Single-Bunched Electron and Positron Beams with a Wideband Feedthrough-BPM at the Positron Capture Section of the SuperKEKB Injector Linac
10.18429/JACoW-IPAC2021-MOPAB174 Foil Hits Reduction by Minimizing Injection Beam Size at the Foil in J-PARC RCS
10.18429/JACoW-IPAC2021-MOPAB195 Development of a Disk-and-Washer Cavity for the J-PARC Muon g-2/EDM Experiment
10.18429/JACoW-IPAC2021-MOPAB209 Commissioning of SANAEM RFQ Accelerator
10.18429/JACoW-IPAC2021-MOPAB221 Developments of a Pulse Kicker System for the Three-Dimensional Spiral Beam Injection of the J-PARC Muon g-2/EDM Experiment
10.18429/JACoW-IPAC2021-MOPAB229 Compensations of Third-Order Resonances in J-PARC MR
10.18429/JACoW-IPAC2021-MOPAB231 Tunability Study of the Ultra-Low β* Optics at ATF2 with New Octupole Setup and Tuning Knobs
10.18429/JACoW-IPAC2021-MOPAB247 Multipacting Studies for the JAEA-ADS Five-Cell Elliptical Superconducting RF Cavities
10.18429/JACoW-IPAC2021-MOPAB256 Development of Pulsed Beam System for the Three Dimensional Spiral Injection Scheme in the J-PARC muon g-2/EDM Experiment
10.18429/JACoW-IPAC2021-MOPAB325 Development of Bunch Width Monitor with High Time Resolution for Low Emittance Muon Beam in the J-PARC Muon g-2 / EDM Experiment
10.18429/JACoW-IPAC2021-MOPAB330 Production and Performance Evaluation of a Compact Deflecting Cavity to Measure the Bunch Length in the cERL
10.18429/JACoW-IPAC2021-MOPAB331 Design Consideration of a Longitudinal Kicker Cavity for Compensating Transient Beam Loading Effect in Synchrotron Light Sources
10.18429/JACoW-IPAC2021-MOPAB343 Optimization of the Parasitic-Mode Damping on the 1.5 GHz TM020-type Harmonic Cavity
10.18429/JACoW-IPAC2021-MOPAB383 Pressure Test for Large Grain and Fine Grain Niobium Cavities
10.18429/JACoW-IPAC2021-TUPAB009 SuperKEKB Optics Measurements Using Turn-by-Turn Beam Position Data
10.18429/JACoW-IPAC2021-TUPAB010 Impact of Bunch Current on Optics Measurements in SuperKEKB
10.18429/JACoW-IPAC2021-TUPAB015 Beam Loading Compensation of APS Cavity with Off-Crest Acceleration in ILC e-Driven Positron Source
10.18429/JACoW-IPAC2021-TUPAB017 Study of Conduction-Cooled Superconducting Quadrupole Magnets Combined with Dipole Correctors for the ILC Main Linac
10.18429/JACoW-IPAC2021-TUPAB020 A Sub-Micron Resolution, Bunch-by-Bunch Beam Trajectory Feedback System and Its Application to Reducing Wakefield Effects in Single-Pass Beamlines
10.18429/JACoW-IPAC2021-TUPAB063 Study of PF-Ring Infrastructure Improvements Using Temperature Measurements in the Ring Tunnel
10.18429/JACoW-IPAC2021-TUPAB064 Specifications and Performance of a Chicane Magnet for the cERL IR-FEL
10.18429/JACoW-IPAC2021-TUPAB099 Construction of an Infrared FEL at the Compact ERL
10.18429/JACoW-IPAC2021-TUPAB174 Basic Design Study for Disk-Loaded Structure in Muon LINAC
10.18429/JACoW-IPAC2021-TUPAB201 Vacuum Tube Operation Tuning for a High Intensity Beam Acceleration in J-PARC RCS
10.18429/JACoW-IPAC2021-TUPAB210 Construction Status of the COMET Experimental Facility
10.18429/JACoW-IPAC2021-TUPAB315 Development of Disaster Prevention System for Accelerator Tunnel
10.18429/JACoW-IPAC2021-TUPAB339 High Power Test of the Antenna Adjustable Power Coupler for 325 MHz Superconducting Cavities
10.18429/JACoW-IPAC2021-TUPAB342 Preliminary Cryogenic Cold Test Results of the First 9-Cell LSF Shape Cavity
10.18429/JACoW-IPAC2021-TUPAB359 Magnetic Field Measurement and Beam Performance Test of Ceramics Chamber with Integrated Pulsed Magnet at KEK-PF
10.18429/JACoW-IPAC2021-WEXA07 Beam Background Measurements at SuperKEKB/Belle-II in 2020
10.18429/JACoW-IPAC2021-WEXB06 Development of an APF IH-DTL in the J-PARC Muon g-2/EDM Experiment
10.18429/JACoW-IPAC2021-WEPAB011 Update on the Low Emittance Tuning of the e⁺/e⁻ Future Circular Collider
10.18429/JACoW-IPAC2021-WEPAB144 A New Flux Concentrator Made of Cu Alloy for the SuperKEKB Positron Source
10.18429/JACoW-IPAC2021-WEPAB177 Consideration of Triple-Harmonic Operation for the J-PARC RCS
10.18429/JACoW-IPAC2021-WEPAB178 Non-Adiabatic Longitudinal Bunch Manipulation at Flattop of the J-PARC MR
10.18429/JACoW-IPAC2021-WEPAB192 Simulation Study on Double Diffuser for Loss Reduction in Slow Extraction at J-PARC Main Ring
10.18429/JACoW-IPAC2021-WEPAB204 Layout of the New Septum Magnets for Fast Extraction in J-PARC Main Ring
10.18429/JACoW-IPAC2021-WEPAB208 Energy Sweeping Beam Extraction by the Septum Magnet Assisted with Charge Exchange for a Hadron Therapy
10.18429/JACoW-IPAC2021-WEPAB297 A Recent Upgrade on Phase Drift Compensation System for a Stable Beam Injection at J-PARC Linac
10.18429/JACoW-IPAC2021-WEPAB342 Beam Induced Power Deposition in CERN SPS Injection Kickers
10.18429/JACoW-IPAC2021-WEPAB358 Development of Low-Z Collimator for SuperKEKB
10.18429/JACoW-IPAC2021-WEPAB359 Report on Collimator Damaged Event in SuperKEKB
10.18429/JACoW-IPAC2021-THXC05 Simulation of Imaging Using Accelerated Muon Beams
10.18429/JACoW-IPAC2021-THPAB007 Technology Spinoff and Lessons Learned from the 4-Turn ERL CBETA
10.18429/JACoW-IPAC2021-THPAB245 A Simulation Study of Beam Pipe Eddy Current Effects on Beam Optics
10.18429/JACoW-IPAC2021-FRXB04 Newly Development of Ceramics Chamber with Integrated Pulsed Magnet for Super-Narrow Bore in KEK-PF
10.18429/JACoW-IPAC2021-FRXB07 Injector Optimization for the IR-FEL Operation at the Compact ERL at KEK