Paper |
Title |
Page |
WEPAB179 |
Recent Status of J-PARC Rapid Cycling Synchrotron |
3027 |
|
- K. Yamamoto
JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
|
|
|
The 3 GeV rapid cycling synchrotron (RCS) at the Ja-pan Proton Accelerator Research Complex (J-PARC) provides more than 500 kW beams to the Material and Life Science Facility (MLF) and Main Ring (MR). In such a high-intensity hadron accelerator, even losing less than 0.1% of the beam can cause many problems. Such lost protons can cause serious radio-activation and accelerator component malfunctions. Therefore, we have been continuing a beam study to achieve high-power operation. In addition, we have also improved and maintained the accelerator components to enable stable operation. This paper reports the status of the J-PARC RCS over the last two years.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB179
|
|
About • |
paper received ※ 13 May 2021 paper accepted ※ 25 June 2021 issue date ※ 22 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|