Author: Wilson, T.
Paper Title Page
WEPAB120 Upgrades to the Booster to Storage Ring Transfer Line at the Canadian Light Source 2881
 
  • W.A. Wurtz, T. Batten, B.E. Bewer, M. Bree, S.R. Carriere, A.M. Duffy, B. Fogal, L.X. Lin, C.M. Randall, B.A. Schneider, J.M. Vogt, J. Willard, T. Wilson
    CLS, Saskatoon, Saskatchewan, Canada
  • P. Kuske
    HZB, Berlin, Germany
 
  Investigations into the booster to storage ring transfer process identified non-linear fields in the booster extraction septum as the cause for the poor transfer efficiency. We found that by correcting the trajectory through the septum, the transfer efficiency improved substantially. This motivated an upgrade project to reliably control the trajectory through the septum and transfer line, to provide improved diagnostics and to implement a set of four horizontal scrapers to reduce the horizontal emittance of the beam before it reaches the storage ring.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB120  
About • paper received ※ 10 May 2021       paper accepted ※ 24 June 2021       issue date ※ 23 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)