TUPAB113 | Highlights From the Conceptual Design Report of the Soft X-Ray Laser at MAX IV | 1651 |
|
||
Funding: Knut and Alice Wallenberg Foundation The SXL (Soft X-ray Laser) project developed a conceptual design for a soft X-ray Free Electron Laser in the 1–5 nm wavelength range, driven by the existing MAX IV 3 GeV linac. In this contribution we will focus on the FEL operation modes developed for the first phase of the project based on two different linac modes. The design work was supported by the Knut and Alice Wallenberg foundation and by several Swedish universities and organizations (Stockholm, Uppsala, KTH Royal Institute of Technology, Stockholm-Uppsala FEL center, MAX IV laboratory and Lund University). |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB113 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 17 June 2021 issue date ※ 19 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAB047 | Status of Magnetic Measurement Benches for Insertion Device Characterization at MAX IV Laboratory | 3848 |
|
||
Insertion Devices (IDs) are the sole source of radiation used in all beamlines in MAX IV Laboratory with 14 IDs in operation of which 6 were built in-house. This paper shows the current capabilities and performance of the of the ID magnetic measurement systems, and the ongoing development work. | ||
![]() |
Poster THPAB047 [1.185 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB047 | |
About • | paper received ※ 11 May 2021 paper accepted ※ 27 July 2021 issue date ※ 28 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAB052 | Insertion Devices at the MAX IV 3 GeV Ring | 3865 |
|
||
Currently, there are 8 Insertion Devices (ID) installed and in operation and 2 new ones to be installed end of 2021 at the MAX IV 3 GeV storage ring. In this paper, the first commissioning results of the three newly installed IDs in 2020 will be described. The new IDs are one APPLE II for SoftiMAX beamline and two In-vacuum Undulators (IVU) for the DanMAX and CoSAXS beamlines. The mitigation scheme adopted to reduce undulator-like radiation from BALDER in-vacuum wiggler will be discussed. Two new IVUs with a period length of 17 mm and 18 mm for the ForMAX and MicroMAX beamlines will be installed during the winter shutdown of 2021-2022. Both IDs have 3 m lengths and a minimum gap of 4 mm. In this paper, the magnetic measurement results will be presented in terms of the achieved field quality and phase error. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB052 | |
About • | paper received ※ 11 May 2021 paper accepted ※ 02 July 2021 issue date ※ 02 September 2021 | |