Author: Shi, L.
Paper Title Page
MOPAB126 BESSY III & MLS II - Status of the Development of the New Photon Science Facility in Berlin 451
 
  • P. Goslawski, M. Abo-Bakr, F. Andreas, M. Arlandoo, J. Bengtsson, V. Dürr, K. Holldack, J.-G. Hwang, A. Jankowiak, B.C. Kuske, J. Li, A.N. Matveenko, T. Mertens, A. Meseck, E.C.M. Rial, M. Ries, M.K. Sauerborn, A. Schälicke, M. Scheer, P. Schnizer, L. Shi, J. Viefhaus
    HZB, Berlin, Germany
  • J. Lüning
    UPMC, Paris, France
 
  HZB operates and develops two synchrotron radiation sources at Berlin Adlershof. The larger one, BESSY II with an energy of 1.7 GeV and 240 m circumference is optimized for soft-X rays and in operation since 1999. The smaller one is the MLS (Metrology Light Source), owned by the Physikalische Technische Bundesanstalt (PTB) - Germany’s National Metrology Institute. It is designed to fulfill the special metrology needs of the PTB with an energy of 0.6 GeV and 48 m circumference, covering the spectral range from THz and IR to EUV/VUV. In 2020 a discussion process has been started to define the requirements for successors of BESSY II and MLS and to study the possibilities integrate them into a new photon science facility in Berlin Adlershof. Here, we give a status report and present a first envisaged parameter space to both machines (see also MOPAB262, MOPAB220, MOPAB048, MOPAB242).  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB126  
About • paper received ※ 18 May 2021       paper accepted ※ 24 June 2021       issue date ※ 18 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)