Author: Schroeder, C.
Paper Title Page
TUPAB178 Recommissioning of the CRYRING@ESR Electron Cooler 1816
 
  • C. Krantz, Z. Andelkovic, C. Dimopoulou, W. Geithner, T. Hackler, F. Herfurth, R. Hess, M. Lestinsky, E. Menz, A. Reiter, J. Roßbach, C. Schroeder, A. Täschner, G. Vorobjev
    GSI, Darmstadt, Germany
  • C. Brandau, S. Schippers
    Justus-Liebig-University Giessen, I. Physics Institute, Atomic and Molecular Physics, Giessen, Germany
  • V. Hannen, D. Winzen
    Westfälische Wilhelms-Universität Münster, Institut für Kernphysik, Münster, Germany
  • C. Weinheimer
    Institut für Kernphysik, Westfälische Wilhelms-Universität Münster, Münster, Germany
 
  Funding: Parts of this work have been supported by the German Federal Ministry of Education and Research (BMBF) under contract numbers 05P19PMFA1 and 05P19RGFA1.
The heavy-ion storage ring CRYRING has been recommissioned downstream of GSI’s ESR, which it complements as dedicated low-energy machine. A key element of CRYRING@ESR is its electron cooler, which features one of the coldest electron beams available. This enables efficient phase-space cooling and, in addition, provides very high energy resolution when used as internal electron target. We report on technical upgrades that have been made as part of the re-installation of the cooler at GSI/FAIR and share first results obtained after recommissioning.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB178  
About • paper received ※ 18 May 2021       paper accepted ※ 16 June 2021       issue date ※ 25 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB380 Testing of the First of Series Quadrupole Doublet Module for the SIS100 Synchrotron 2409
 
  • P. Aguar Bartolome, M. Al Ghanem, M. Becker, A. Bleile, R. Bluemel, L.H.J. Bozyk, V.I. Datskov, W. Freisleben, A. Kario, P. Kowina, K.K. Kozlowski, F. Kurian, S. Lindner, J.P. Meier, T. Miertsch, S.S. Mohite, V.P. Plyusnin, I. Pongrac, C. Roux, C. Schroeder, P.J. Spiller, K. Sugita, A. Szwangruber, P.B. Szwangruber, F. Walter, H. Welker, St. Wilfert, T. Winkler, S. Zeller
    GSI, Darmstadt, Germany
 
  A new international facility for antiproton and ion research (FAIR) is currently under construction in Darmstadt, Germany. The high intensity primary beam required for different research experiments will be provided by the SIS100 heavy ion synchrotron. The synchrotron is composed of fast cycling superconducting magnets from which about 300 will be integrated in Quadrupole Doublet Modules (QDM). Each module consists of two units composed of a quadrupole and corrector magnets. The First of Series Quadrupole Doublet Module was delivered to the test facility at GSI in November 2019. The assembled doublet was subjected to a dedicated test program to verify the functionality of the module components at cryogenic temperature and operating conditions. The results obtained during the testing campaign will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB380  
About • paper received ※ 19 May 2021       paper accepted ※ 18 June 2021       issue date ※ 02 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)