Paper |
Title |
Page |
MOPAB126 |
BESSY III & MLS II - Status of the Development of the New Photon Science Facility in Berlin |
451 |
|
- P. Goslawski, M. Abo-Bakr, F. Andreas, M. Arlandoo, J. Bengtsson, V. Dürr, K. Holldack, J.-G. Hwang, A. Jankowiak, B.C. Kuske, J. Li, A.N. Matveenko, T. Mertens, A. Meseck, E.C.M. Rial, M. Ries, M.K. Sauerborn, A. Schälicke, M. Scheer, P. Schnizer, L. Shi, J. Viefhaus
HZB, Berlin, Germany
- J. Lüning
UPMC, Paris, France
|
|
|
HZB operates and develops two synchrotron radiation sources at Berlin Adlershof. The larger one, BESSY II with an energy of 1.7 GeV and 240 m circumference is optimized for soft-X rays and in operation since 1999. The smaller one is the MLS (Metrology Light Source), owned by the Physikalische Technische Bundesanstalt (PTB) - Germany’s National Metrology Institute. It is designed to fulfill the special metrology needs of the PTB with an energy of 0.6 GeV and 48 m circumference, covering the spectral range from THz and IR to EUV/VUV. In 2020 a discussion process has been started to define the requirements for successors of BESSY II and MLS and to study the possibilities integrate them into a new photon science facility in Berlin Adlershof. Here, we give a status report and present a first envisaged parameter space to both machines (see also MOPAB262, MOPAB220, MOPAB048, MOPAB242).
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB126
|
|
About • |
paper received ※ 18 May 2021 paper accepted ※ 24 June 2021 issue date ※ 18 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPAB317 |
Online Model Developments for BESSY II and MLS |
3413 |
|
- P. Schnizer, J. Bengtsson, T. Birke, J. Li, T. Mertens, M. Ries, A. Schälicke, L. Vera Ramirez
HZB, Berlin, Germany
|
|
|
Digital models have been developed over a long time for preparing accelerator commissioning next to benchmarking theory predictions to machine measurements. These digital models are nowadays being realized as digital shadows or digital twins. Accelerator commissioning requires periodic setup and review of the machine status. Furthermore, different measurements are only practical by comparison to the machine model (e.g. beam based alignment). In this paper we describe the architecture chosen for our models, describe the framework Bluesky for measurement orchestration and report on our experience exemplifying on dynamic aperture scans. Furthermore we describe our plans to extend the models applied to BESSY~II and MLS to the currently planned machines BESSY~III and MLS~II.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB317
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 28 July 2021 issue date ※ 21 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|