Paper | Title | Page |
---|---|---|
TUPAB205 | Advancement of LANSCE Front End Accelerator Facility | 1894 |
|
||
Funding: Work supported by US DOE under contract 89233218CNA000001 The LANSCE accelerator started routine operation in 1972 as a high-power facility for fundamental research and national security applications. To reduce long-term operational risk, we propose to develop a new Front End of accelerator facility. It contains 100-keV injector with 3-MeV RFQ, and 6-tanks Drift Tube Linac to accelerate particles up to energy of 100 MeV. The low-energy injector concept includes two independent transports merging H+ and H− beams at the entrance of RFQ. Beamlines are aimed to perform preliminary beam bunching in front of accelerator section with subsequent simultaneous acceleration of two different beams in a single RFQ. The paper discusses design topics of new Front End of accelerator facility. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB205 | |
About • | paper received ※ 12 May 2021 paper accepted ※ 28 May 2021 issue date ※ 14 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |