Author: Rotundo, U.
Paper Title Page
TUPAB001 DAΦNE Commissioning for SIDDHARTA-2 Experiment 1322
 
  • C. Milardi, D. Alesini, O.R. Blanco-García, M. Boscolo, B. Buonomo, S. Cantarella, A. D’Uffizi, A. De Santis, C. Di Giulio, G. Di Pirro, A. Drago, L.G. Foggetta, G. Franzini, A. Gallo, S. Incremona, A. Michelotti, L. Pellegrino, L. Piersanti, R. Ricci, U. Rotundo, L. Sabbatini, A. Stecchi, A. Stella, A. Vannozzi, M. Zobov
    INFN/LNF, Frascati, Italy
  • J. Chavanne, G. Le Bec, P. Raimondi
    ESRF, Grenoble, France
 
  DAΦNE, the Frascati lepton collider, has completed the preparatory phase in order to deliver luminosity to the SIDDHARTA-2 detector. DAΦNE colliding rings rely on a new interaction region, which implements the well-established Crab-Waist collision scheme, and includes a low-beta section equipped with newly designed permanent magnet quadrupoles, and vacuum components. Diagnostics tools have been improved, especially the ones used to keep under control the beam-beam interaction. The horizontal feedback in the positron ring has been potentiated in order to achieve a higher positron current. Luminosity diagnostics have been also updated so to be compatible with the new detector design. The commissioning was initially focused on recovering the optimal dynamical vacuum conditions, outlining alignment errors, and optimizing ring optics. For this reason, a detuned optics, featured by relaxed low-b condition at the interaction point and Crab-Waist Sestupoles off, has been applied. In a second stage a low-b optics has been implemented to test collisions with a preliminary setup of the experiment detector. Machine preparation and the first luminosity results are presented and discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB001  
About • paper received ※ 19 May 2021       paper accepted ※ 09 June 2021       issue date ※ 10 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)