Author: Rogovsky, Yu.A.
Paper Title Page
TUPAB002 Round Colliding Beams: Successful Operation Experience 1326
 
  • D.B. Shwartz, O.V. Belikov, D.E. Berkaev, D.B. Burenkov, V.S. Denisov, A.S. Kasaev, A.N. Kirpotin, S.A. Kladov, I. Koop, A.A. Krasnov, A.V. Kupurzhanov, G.Y. Kurkin, M.A. Lyalin, A.P. Lysenko, S.V. Motygin, E. Perevedentsev, V.P. Prosvetov, Yu.A. Rogovsky, A.M. Semenov, A.I. Senchenko, L.E. Serdakov, D.N. Shatilov, P.Yu. Shatunov, Y.M. Shatunov, M.V. Timoshenko, I.M. Zemlyansky, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • S.A. Kladov, I. Koop, A.A. Krasnov, M.A. Lyalin, E. Perevedentsev, Yu.A. Rogovsky, Y.M. Shatunov, D.B. Shwartz
    NSU, Novosibirsk, Russia
 
  VEPP-2000 electron-positron collider operating in the beam energy range of 150-1000 MeV is the only machine originally designed for and successfully exploiting Round Beams Concept. After injection chain upgrade including link to the new BINP injection complex VEPP-2000 proceeded with data taking since 2017 with luminosity limited only by beam-beam effects. At the low energies (300-600 MeV/beam) the novel technique of effective emittance controlled increase by weak coherent beam shaking allowed to suppress the limiting flip-flop effect and resulted in additional luminosity gain factor of 4. The averaged delivered luminosity at the omega-meson production energy (2*391 MeV) achieved L = 2*1031cm-2s−1/IP. At the top energies above nucleon-antinucleon production threshold the stable operation with luminosity of L = 5*1031cm-2s−1/IP resulted in high average data taking rate of 2 pb-1/day in 2020.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB002  
About • paper received ※ 20 May 2021       paper accepted ※ 07 June 2021       issue date ※ 31 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB021 Status of VEPP-5 Injection Complex 3796
 
  • F.A. Emanov, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, Y.M. Boimelshtain, D. Bolkhovityanov, A. Butakov, A.R. Frolov, G.V. Karpov, A.S. Kasaev, A.A. Kondakov, N.Kh. Kot, E.S. Kotov, G.Y. Kurkin, R.M. Lapik, N.N. Lebedev, A.E. Levichev, Yu.I. Maltseva, P.V. Martyshkin, S.V. Motygin, A.A. Murasev, V. Muslivets, D.A. Nikiforov, A.V. Pavlenko, A.M. Pilan, Yu.A. Rogovsky, S.L. Samoylov, A.G. Tribendis, S. Vasiliev, V.D. Yudin
    BINP SB RAS, Novosibirsk, Russia
 
  VEPP-5 injection complex is being put into operation as beam source of VEPP-2000 and VEPP-4 colliders at the end of 2016. Since then injection complex demonstrated maximum positron storage rate 1.7·1010 e+/s and stable operation at the energy of 430 MeV. Latest operation results and prospects are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB021  
About • paper received ※ 20 May 2021       paper accepted ※ 27 July 2021       issue date ※ 27 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)