TUPAB040 | Design Concept for the Second Interaction Region for Electron-Ion Collider | 1435 |
|
||
Funding: Jefferson Science Associates, LLC under Contract No. DE-AC05-06OR23177 and Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 with the U.S. Department of Energy. The possibility of two interaction regions (IRs) is a design requirement for Electron-Ion Collider (EIC). There is also a significant interest from the nuclear physics community to have a 2nd IR with measurement capabilities complementary to those of the 1st IR. While the 2nd IR will be in operation over the entire energy range of ~20GeV to ~140GeV center of mass (CM). The 2nd IR can also provide an acceptance coverage complementary to that of the 1st. In this paper, we present a brief overview and the current progress of the 2nd IR design in terms of the parameters, magnet layout, and beam dynamics. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB040 | |
About • | paper received ※ 24 May 2021 paper accepted ※ 31 August 2021 issue date ※ 30 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAB041 | Detector Solenoid Compensation for the Electron-Ion Collider | 1439 |
|
||
Funding: Jefferson Science Associates, LLC Contract No. DE-AC05-06OR23177, Fermi Research Alliance, LLC Contract No. DE-AC02-07CH11359, and Brookhaven Science Associates, LLC Contract No. DE-SC0012704 The central detector in the present EIC design includes a 4 m long solenoid with an integrated strength of up to 12 Tm. The electron beam passes on-axis through the solenoid, but the hadron beam has an angle of 25 mrad. Thus the solenoid couples horizontal and vertical betatron motion in both electron and hadron storage rings, and causes a vertical closed orbit excursion in the hadron ring. The solenoid also couples the transverse and longitudinal motions of both beams, when crab cavities are also considered. In this paper, we present schemes for closed orbit correction and coupling compensation at the IP, including crabbing. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB041 | |
About • | paper received ※ 28 May 2021 paper accepted ※ 31 August 2021 issue date ※ 12 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |