MOXA01 Commissioning and Restart of ESRF-EBS 1
 
  • S.M. White, N. Carmignani, L.R. Carver, J. Chavanne, L. Farvacque, L. Hardy, J. Jacob, G. Le Bec, S.M. Liuzzo, T.P. Perron, Q. Qin, P. Raimondi, J.-L. Revol, K.B. Scheidt
    ESRF, Grenoble, France
 
  The ESRF operates a 6 GeV 4th generation light source, the ESRF-EBS. This storage ring is the first to implement the Hybrid Multi-Bend Achromat lattice (HMBA). The HMBA lattice provides a reduction of the horizontal emittance of approximately a factor 30 with respect to the former Double Bend Achromat (DBA) structure, considerably improving the brilliance and transverse coherence of the ESRF accelerator complex while maintaining large horizontal acceptance and excellent lifetime performance. In this report, the characteristics of the HMBA lattice will be reviewed and the beam commissioning results and first operation experience of the new ESRF storage ring will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOXA01  
About • paper received ※ 11 May 2021       paper accepted ※ 31 August 2021       issue date ※ 01 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB001 DAΦNE Commissioning for SIDDHARTA-2 Experiment 1322
 
  • C. Milardi, D. Alesini, O.R. Blanco-García, M. Boscolo, B. Buonomo, S. Cantarella, A. D’Uffizi, A. De Santis, C. Di Giulio, G. Di Pirro, A. Drago, L.G. Foggetta, G. Franzini, A. Gallo, S. Incremona, A. Michelotti, L. Pellegrino, L. Piersanti, R. Ricci, U. Rotundo, L. Sabbatini, A. Stecchi, A. Stella, A. Vannozzi, M. Zobov
    INFN/LNF, Frascati, Italy
  • J. Chavanne, G. Le Bec, P. Raimondi
    ESRF, Grenoble, France
 
  DAΦNE, the Frascati lepton collider, has completed the preparatory phase in order to deliver luminosity to the SIDDHARTA-2 detector. DAΦNE colliding rings rely on a new interaction region, which implements the well-established Crab-Waist collision scheme, and includes a low-beta section equipped with newly designed permanent magnet quadrupoles, and vacuum components. Diagnostics tools have been improved, especially the ones used to keep under control the beam-beam interaction. The horizontal feedback in the positron ring has been potentiated in order to achieve a higher positron current. Luminosity diagnostics have been also updated so to be compatible with the new detector design. The commissioning was initially focused on recovering the optimal dynamical vacuum conditions, outlining alignment errors, and optimizing ring optics. For this reason, a detuned optics, featured by relaxed low-b condition at the interaction point and Crab-Waist Sestupoles off, has been applied. In a second stage a low-b optics has been implemented to test collisions with a preliminary setup of the experiment detector. Machine preparation and the first luminosity results are presented and discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB001  
About • paper received ※ 19 May 2021       paper accepted ※ 09 June 2021       issue date ※ 10 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB048 HMBA Optics Correction Experience at ESRF 1462
 
  • S.M. Liuzzo, N. Carmignani, L.R. Carver, L. Farvacque, T.P. Perron, P. Raimondi, S.M. White
    ESRF, Grenoble, France
 
  The ESRF-EBS storage ring, successfully commissioned in 2020, operates the HMBA lattice, first proposed in * and then adopted in several recent upgrade programs. The successful and timely commissioning of the storage is in large part due to the excellent optics control achieved over that period. Design performance were obtained with lower than predicted correction strengths, localized for the most part in the vicinity of sextupoles. This remarkable behavior is not only the result of the corrective actions taken during the commissioning but also of the extremely accurate conception and alignment of the machine. This report summarizes the steps that lead to the present performances and discusses their stability over time.
* J.Biasci et al. Synchrotron Radiation News27, 8 (2014), https://doi.org/10.1080/08940886.2014.970931.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB048  
About • paper received ※ 10 May 2021       paper accepted ※ 11 June 2021       issue date ※ 20 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB074 ESRF-EBS: Implementation, Performance and Restart of User Operation 3929
 
  • J.-L. Revol, P. Berkvens, J.-F. Bouteille, N. Carmignani, L.R. Carver, J.M. Chaize, J. Chavanne, F. Ewald, A. Franchi, L. Hardy, J. Jacob, L. Jolly, G. Le Bec, I. Leconte, S.M. Liuzzo, D. Martin, J. Pasquaud, T.P. Perron, Q. Qin, P. Raimondi, B. Roche, K.B. Scheidt, R. Versteegen, S.M. White
    ESRF, Grenoble, France
 
  The European Synchrotron Radiation Facility - Extremely Brilliant Source (ESRF-EBS) is a facility upgrade allowing its scientific users to take advantage of the first high-energy 4th generation light source. In December 2018, after 30 years of operation, the beam stopped for a 12-month shutdown to dismantle the old storage ring and to install the new X-ray source. In December 2019, the first beam was stored and accumulated in the storage ring, allowing the vacuum conditioning and tuning to be started. The beam was delivered to beamlines in March 2020 for their commissioning. On 25 August, the user programme was restarted with beam parameters very close to nominal values. In this report, the milestones and key aspects of the return to user-mode operation are presented and discussed.  
poster icon Poster THPAB074 [2.864 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB074  
About • paper received ※ 19 May 2021       paper accepted ※ 26 July 2021       issue date ※ 01 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)