Paper |
Title |
Page |
MOPAB008 |
Exploiting the Beam-Beam Wire Demonstrators in the Next LHC Run 3 |
65 |
|
- A. Poyet
Université Grenoble Alpes, Grenoble, France
- S.D. Fartoukh, N. Karastathis, Y. Papaphilippou, A. Rossi, G. Sterbini
CERN, Geneva, Switzerland
- K. Skoufaris
University of Crete, Heraklion, Crete, Greece
|
|
|
After the successful experiments performed during the LHC Run 2 with the Beam-Beam Wire demonstrators installed, on Beam 2, in the frame of the HL-LHC project, two of the four wire demonstrators were moved to Beam 1. The objective is to gain operational experience with the wire compensation also on that beam and therefore fully exploit the demonstrators’ potential. This paper proposes a numerical validation of the wire implementation using Run 3 scenarios and explores the optimization of those devices in that respect.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB008
|
|
About • |
paper received ※ 17 May 2021 paper accepted ※ 24 May 2021 issue date ※ 11 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|