Paper | Title | Page |
---|---|---|
MOPAB277 | Installation, Use and Follow-Up of an Emittance-Meter at the Arronax Cyclotron 70XP | 877 |
|
||
Funding: This work is supported by grants from the ANR program "Investissements d’Avenir", n°ANR-11-EQPX-0004, n°ANR-11-LABX-18-01 and n°ANR-16-IDE-0007 and by a PhD scholarship from CNRS/IN2P3. The 70 MeV cyclotron group of the Arronax GIP (Interest Public Group), France, foresees to increase its beam intensity on target. For this, several beam studies are being performed in the various sections of the accelerator including the injection. Thus, an Allison-type emittance-meter has been installed in this section above the cyclotron and downstream a quadrupole triplet. Installation and the first results of a campaign of measurements are presented including high intensity runs, up to 1 mA for 40 keV H− ions. The emittance-meter is expected to be used with several accelerators throughout the world. Therefore, a strategy on the follow-up of the activation of sample materials used in the equipment is being established and is described in the paper. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB277 | |
About • | paper received ※ 17 May 2021 paper accepted ※ 27 May 2021 issue date ※ 12 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |