TUPAB173 | ESS Drift Tube Linac Manufacturing, Assembly and Tuning | 1797 |
|
||
The Drift Tube Linac (DTL) for the ESS Linac will accelerate H+-beams of up to 62.5 mA peak current from 3.62 to 90 MeV. The structure consists of five cavities. The first cavity (DTL1) is a 7.6 m long tank containing 60 drift tubes, 23 fixed tuners, 3 movable tuners and 24 post-couplers, operating at a frequency of 352.21 MHz and an average accelerating field of 3.0 MV/m. The cavity is now assembled at ESS, the results of alignment and tuning are here presented. The DTL1 "as-built" as been analyzed from the beam dynamics point of view. The manufacturing of DTL4 and DTL3 is completed and they are now under assembly at ESS. DTL2 and DTL5 manufacturing will be completed within 2021. The paper describes the production and assembly stages, with a focus on the statistics of quality check in terms of metrology, alignment, leak tests. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB173 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 27 May 2021 issue date ※ 14 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAB211 | The Accelerator System of IFMIF-DONES Multi-MW Facility | 1910 |
|
||
Funding: Work carried out within EUROfusion Consortium and DONES-PreP and received funding from the Euratom research and training programme 2014-2018 & 2019-2020 under grants agreement No. 633053 & 870186 The IFMIF-DONES (DEMO-Oriented Neutron Early Source) facility has passed the preliminary design phase and the detailed design phase is very much advanced. Next step will be the preparation phase for the construction of the facility. The DONES facility aims at developing a database of fusion-like radiation effects on materials to be used in future fusion reactors up to damage levels expected in the EU DEMO. It will be based on an intense neutron source created by an accelerated deuteron beam (125 mA CW, 40 MeV) impinging on a liquid lithium curtain. The DONES Accelerator Systems (AS) will be responsible of delivering this 5 MW D+ beam with very high availability. The beam acceleration will be performed by several stages: an ion source and LEBT, an RFQ, a MEBT, an SRF Linac and a HEBT transporting and delivering an optimized profile down to the target. A high power RF system and several ancillaries will ensure the equipment is properly operated. This contribution will report the present status of the AS design, the main challenges faced, the R&D programme to overcome them, and the prospects for the construction and commissioning of the DONES accelerator in Granada (Spain). |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB211 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 17 June 2021 issue date ※ 27 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |