Author: Orduz, A.K.
Paper Title Page
WEXB05 Beam Commissioning SPIRAL2 2540
 
  • A.K. Orduz, M. Di Giacomo, R. Ferdinand, B. Jacquot, O. Kamalou, J.-M. Lagniel, G. Normand, A. Savalle
    GANIL, Caen, France
  • D. Uriot
    CEA-IRFU, Gif-sur-Yvette, France
 
  The SPIRAL2 injector includes a 5 mA proton-deuteron ECR source, a 1 mA ECR heavy ion source (up to A/Q =3) and a CW 0.73 MeV/u RFQ. It has been successfully commissioned using a diagnostic-plate in parallel with the superconducting linac installation. The green light has been obtained for the LINAC commissioning in July of 2019, starting with the Medium Energy Beam Transport (MEBT) commissioning with protons then with helium in 2020. The MEBT line and tuning process are described. The main experimental results are given, including the emittance and profile measurements which are compared with TraceWin simulations. RFQ output energy variation has been found due to an input energy error, its correction optimizing the source platform voltage is presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEXB05  
About • paper received ※ 19 May 2021       paper accepted ※ 25 June 2021       issue date ※ 13 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)