Author: Monteserin, M.R.
Paper Title Page
TUPAB031 Construction and Installation of the New CERN Proton Synchrotron Internal Beam Dumps 1409
 
  • K.G. Andersen, M. Calviani, A. Cherif, T. Coiffet, A. De Macedo, S. Devidal, J.-M. Geisser, S.S. Gilardoni, M.M.J. Gillet, E. Grenier-Boley, J.M. Heredia, A. Majbour, F. Monnet, M.R. Monteserin, F.-X. Nuiry, D. Pugnat, G. Romagnoli, Y.D.R. Seraphin, J.A.F. Somoza, N. Thaus
    CERN, Geneva, Switzerland
 
  In the framework of the CERN Large Hadron Collider Injectors Upgrade (LIU) Project, the Proton Synchrotron (PS) has been equipped with two new movable Internal Dumps (PSID), each of them capable of absorbing particle beams of an energy of up to 100 kJ. These dumps replace the old Internal Dumps, which have been operated in the accelerator complex since their installation in 1975 until their decommissioning and removal from the machine during the second LHC Long Shut down (LS2). This contribution will address the construction and testing phases of the new PSIDs, including the assembly of the dump core, its actuation system and the respective shielding, mechanical running-in tests, metrology adjustments, Ultra-High Vacuum (UHV) and impedance acceptance tests. The described installation work was completed successfully, and the new generation Dumps are currently operational in the PS machine.  
poster icon Poster TUPAB031 [3.146 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB031  
About • paper received ※ 18 May 2021       paper accepted ※ 27 May 2021       issue date ※ 26 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)