Paper |
Title |
Page |
MOPAB025 |
First Experiments with Accelerated Ion Beams in the Booster of NICA Accelerator Complex |
123 |
|
- A.V. Butenko, V. Andreev, A.M. Bazanov, O.I. Brovko, D.E. Donets, A.V. Eliseev, I.V. Gorelyshev, A.V. Konstantinov, S.A. Kostromin, O.S. Kozlov, K.A. Levterov, A. Nesterov, A.V. Philippov, D.O. Ponkin, G.S. Sedykh, I.V. Shirikov, A.O. Sidorin, E. Syresin, A. Tuzikov, V. Volkov
JINR/VBLHEP, Moscow, Russia
- N.N. Agapov, A.V. Alfeev, A.A. Baldin, A.A. Fateev, A.R. Galimov, B.V. Golovenskiy, E.V. Gorbachev, A. Govorov, E.V. Ivanov, V. Karpinsky, V.D. Kekelidze, H.G. Khodzhibagiyan, A. Kirichenko, A.G. Kobets, S.A. Korovkin, V. Kosachev, A.D. Kovalenko, G. Kunchenko, I.N. Meshkov, V.A. Mikhailov, V.A. Monchinsky, D. Nikiforov, R.V. Pivin, S. Romanov, A.A. Shurygin, A.I. Sidorov, A.N. Svidetelev, G.V. Trubnikov, B. Vasilishin
JINR, Dubna, Moscow Region, Russia
- G.A. Fatkin
Cosylab Siberia, Novosibirsk, Russia
|
|
|
The NICA accelerator complex in JINR consist of two linear injector chains, a 578 MeV/u superconducting (SC) Booster synchrotron, the existing SC synchrotron Nuclotron, and a new SC collider that has two storage rings. The construction of the facility is based on the Nuclotron technology of SC magnets with an iron yoke and hollow SC cable. Assembly of the Booster synchrotron was finished in autumn of 2020 and first machine Run and experiments with ion beams were successfully done in December 2020. The results of this Run are discussed in this paper.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB025
|
|
About • |
paper received ※ 16 May 2021 paper accepted ※ 07 September 2021 issue date ※ 15 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPAB192 |
LILac Energy Upgrade to 13 MeV |
651 |
|
- B. Koubek, S. Altürk, M. Busch, H. Höltermann, J.D. Kaiser, H. Podlech, U. Ratzinger, M. Schuett, M. Schwarz, W. Schweizer, D. Strehl, R. Tiede, C. Trageser
BEVATECH, Frankfurt, Germany
- A. Brunzel, P. Nonn, H. Schlarb
DESY, Hamburg, Germany
- A.V. Butenko, D.E. Donets, B.V. Golovenskiy, A. Govorov, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.A. Monchinsky, D.O. Ponkin, K.V. Shevchenko, I.V. Shirikov, E. Syresin
JINR, Dubna, Moscow Region, Russia
|
|
|
In the frame of the NICA (Nuclotron-based Ion Collider fAcility) ion collider upgrade a new light ion LINAC for protons and ions will be built in collaboration between JINR and BEVATECH GmbH. While ions with a mass-to-charge ratio up to 3 will be fed into the NUCLOTRON ring with an energy of 7 MeV/u, protons are supposed to be accelerated up to an energy of 13 MeV using a third IH structure. This energy upgrade comprises a third IH structure, a dual-use Debuncher cavity as well as an extension of the LLRF control system built on MicroTCA technology.
|
|
|
Poster MOPAB192 [4.914 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB192
|
|
About • |
paper received ※ 11 May 2021 paper accepted ※ 31 May 2021 issue date ※ 20 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPAB176 |
Acceleration of He+ Beams for Injection Into NICA Booster During its First Run |
3016 |
|
- K.A. Levterov, V.P. Akimov, D.S. Letkin, D.O. Leushin, V.V. Mialkovskiy
JINR/VBLHEP, Dubna, Moscow region, Russia
- A.M. Bazanov, A.V. Butenko, D.E. Donets, D. Egorov, A.R. Galimov, B.V. Golovenskiy, A. Govorov, V.V. Kobets, A.D. Kovalenko, D.A. Lyuosev, A.A. Martynov, V.A. Monchinsky, D.O. Ponkin, I.V. Shirikov, A.O. Sidorin, E. Syresin, G.V. Trubnikov, A. Tuzikov
JINR, Dubna, Moscow Region, Russia
- H. Höltermann, H. Podlech
BEVATECH, Frankfurt, Germany
- U. Ratzinger, A. Schempp
IAP, Frankfurt am Main, Germany
|
|
|
Heavy Ion Linear Accelerator (HILAC) is designed to accelerate the heavy ions with ratio A/Z<=6.25 produced by ESIS ion source up to the 3.2 MeV for the injection into superconducting synchrotron (SC) Booster. HILAC was commissioned in 2018 using the carbon beams from Laser Ion Source (LIS). The project output energy was verified. Transmission could be estimated only for DTL structure because of the presence at the RFQ input the mixture of ions with different charge states extracted from laser-plasma. To estimate transmission through the whole linac the ion source producing the only species He+ was designed. The beams of He+ ions were used for the first run of SC Booster. The design of the helium ion source and results of the He+ beam acceleration and injection are described.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB176
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 11 June 2021 issue date ※ 22 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|