Author: Mikhailov, V.A.
Paper Title Page
MOPAB025 First Experiments with Accelerated Ion Beams in the Booster of NICA Accelerator Complex 123
 
  • A.V. Butenko, V. Andreev, A.M. Bazanov, O.I. Brovko, D.E. Donets, A.V. Eliseev, I.V. Gorelyshev, A.V. Konstantinov, S.A. Kostromin, O.S. Kozlov, K.A. Levterov, A. Nesterov, A.V. Philippov, D.O. Ponkin, G.S. Sedykh, I.V. Shirikov, A.O. Sidorin, E. Syresin, A. Tuzikov, V. Volkov
    JINR/VBLHEP, Moscow, Russia
  • N.N. Agapov, A.V. Alfeev, A.A. Baldin, A.A. Fateev, A.R. Galimov, B.V. Golovenskiy, E.V. Gorbachev, A. Govorov, E.V. Ivanov, V. Karpinsky, V.D. Kekelidze, H.G. Khodzhibagiyan, A. Kirichenko, A.G. Kobets, S.A. Korovkin, V. Kosachev, A.D. Kovalenko, G. Kunchenko, I.N. Meshkov, V.A. Mikhailov, V.A. Monchinsky, D. Nikiforov, R.V. Pivin, S. Romanov, A.A. Shurygin, A.I. Sidorov, A.N. Svidetelev, G.V. Trubnikov, B. Vasilishin
    JINR, Dubna, Moscow Region, Russia
  • G.A. Fatkin
    Cosylab Siberia, Novosibirsk, Russia
 
  The NICA accelerator complex in JINR consist of two linear injector chains, a 578 MeV/u superconducting (SC) Booster synchrotron, the existing SC synchrotron Nuclotron, and a new SC collider that has two storage rings. The construction of the facility is based on the Nuclotron technology of SC magnets with an iron yoke and hollow SC cable. Assembly of the Booster synchrotron was finished in autumn of 2020 and first machine Run and experiments with ion beams were successfully done in December 2020. The results of this Run are discussed in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB025  
About • paper received ※ 16 May 2021       paper accepted ※ 07 September 2021       issue date ※ 15 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)