Author: Komatsu, Y.
Paper Title Page
TUPAB210 Construction Status of the COMET Experimental Facility 1907
 
  • Y. Fukao, K. Agari, H. Akiyama, E. Hirose, M. Ieiri, Y. Igarashi, M.I. Iio, N. Kamei, Y. Katoh, Y. Komatsu, R. Kurasaki, M. Maki, S. Makimura, S. Mihara, M. Minakawa, Y. Morino, F. Muto, H. Nishiguchi, T. Okamura, K. Sasaki, Y. Sato, S. Sawada, N. Sumi, H. Takahashi, K.H. Tanaka, A. Toyoda, K. Ueno, H. Watanabe, Y. Yamanoi, M.Y. Yoshida
    KEK, Ibaraki, Japan
 
  COMET (COherent Muon to Electron Transition) is an experimental project that hunts for a phenomenon of the conversion from the muon to the electron (mu-e conversion). The mu-e conversion violates the lepton flavor universality and its discovery indicates a proof of the physics beyond the standard model of the particle physics. The experiment utilizes a high-intensity primary proton-beam of J-PARC (Japan Proton Accelerator Research Complex). The proton beam is injected to a target about 700mm long to generate a high intensity muon beam so as to accumulate huge statistics and achieve the final goal of a sensitivity of 10-16. Construction of the experimental facility is underway at a high pace towards an engineering run in 2022 and the first physics run in 2023. In this presentation, we would like to present a current status of the COMET facility construction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB210  
About • paper received ※ 17 June 2021       paper accepted ※ 21 June 2021       issue date ※ 13 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)