Paper |
Title |
Page |
MOPAB115 |
ATS/STA Transfer Line Design for the ALS Upgrade Project (ALS-U) |
417 |
|
- C. Sun, M.P. Ehrlichman, T. Hellert, M. Juchno, J.-Y. Jung, M. Mardenfeld, J.R. Osborn, G. Penn, C. Steier, C.A. Swenson, M. Venturini
LBNL, Berkeley, California, USA
|
|
|
At the Advanced Light Source Upgrade (ALS-U), an on-axis swap-out injection will be used to replenish depleted bunches in the storage ring with refreshed bunches from the full energy accumulator ring. To implement this scheme, two transfer lines are required between the storage ring and the accumulator ring: the accumulator-to-storage-ring (ATS) transfer line and the storage-ring-to-accumulator (STA) transfer line. The design of the ATS/STA transfer lines is a challenging task as they must fit within a tight injection region while also accommodating the storage and accumulator rings at different elevations. Moreover, the ATS/STA design needs to meet both the boundary conditions and optics requirements. In this paper, we will present a design option for these ATS/STA transfer lines.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB115
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 27 May 2021 issue date ※ 15 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|