Paper | Title | Page |
---|---|---|
TUPAB295 | Upgrade to the EPICS Control System at the Argonne Wakefield Accelerator Test Facility | 2173 |
|
||
Funding: US Department of Energy, Office of Science The Argonne Wakefield Accelerator (AWA) Test Facility has used a completely homebrewed, MS Windows-based control system for the last 20 years. In an effort to modernize the control system and prepare for an active machine learning program, the AWA will work with the Advanced Photon Source (APS) controls group to upgrade its control system to EPICS. The EPICS control system is expected to facilitate collaborations and support the future growth of AWA. An overview of the previous AWA control and data acquisition system is presented, along with a vision and path for completing the EPICS upgrade. |
||
![]() |
Poster TUPAB295 [1.108 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB295 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 01 July 2021 issue date ※ 30 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |