Paper | Title | Page |
---|---|---|
TUPAB315 | Development of Disaster Prevention System for Accelerator Tunnel | 2228 |
|
||
Funding: This work is supported by Health Labor Sciences Research Grant of Japan In an enclosed space such as a particle accelerator tunnel, ensuring worker safety during a disaster is an issue of critical importance. It is necessary to have a system in which the manager can know from outside the tunnel whether there is any worker left behind and whether the worker is escaping in the right direction. Because a global positioning system (GPS) is not available in the tunnel, we are developing a disaster prevention system that uses Wi-Fi to transmit the positioning of workers and two-way communication. The Wi-Fi access point (AP) installed in the tunnel should be radiation resistant. Additionally, the equipment carried by the worker is convenient and easy to carry. We tested the radiation hardness of commercial AP devices and developed a smartphone application to perform location information transmission and simultaneous character transmission. In 2019, we installed the system on the J-PARC Main Ring and started its operation. In this paper, the functions of the developed system and its prospects are described. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB315 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 10 June 2021 issue date ※ 25 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPAB204 | Layout of the New Septum Magnets for Fast Extraction in J-PARC Main Ring | 3103 |
|
||
At J-PARC Main Ring (MR), we are pursuing to improve the beam power from 500 kW to 1.3 MW by reducing the repetition cycle from 2.48 to 1.16 seconds (1 Hz operation). Additionally, we are considering the beam particles increasing by selecting a more optimal tune. The fast extraction (FX) equipment to the neutrino facility (NU) is needed to upgrade for the 1 Hz operation. We plan to replace most FX septum magnets with new ones in 2021. We report a layout of the FX line in confirmation of new beam optics and mention the beam loss during the fast extraction. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB204 | |
About • | paper received ※ 20 May 2021 paper accepted ※ 09 June 2021 issue date ※ 27 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |