Author: Huang, M.Y.
Paper Title Page
MOPAB200 Parameters Measurements of Proton Beam Extracted from CSNS/RCS 668
 
  • Z.P. Li, Y.W. An, M.Y. Huang
    IHEP, Beijing, People’s Republic of China
  • Y. Li, S.Y. Xu
    DNSC, Dongguan, People’s Republic of China
  • H.Y. Liu
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  In order to study the emittance evolution of the circulating beam in the fast-cycling synchrotron (RCS) of the Chinese Spallation Neutron Source (CSNS), parameter measurements of the beam extracted at different times were carried out. The measurements were mainly based on wire-scanners mounted in RCS to target transport line (RTBT) for beam profile measurement, and different methods were applied in the solution processes. The emittance and C.S parameters of the extracted beam at different times were obtained and studied, which provided an important reference basis for the beam commissioning of RCS. The beam envelope along the RTBT has been matched and re-measured, which was in good agreement with the design optics.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB200  
About • paper received ※ 19 May 2021       paper accepted ※ 21 May 2021       issue date ※ 25 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB196 Achievement of 100-kW Beam Operation in CSNS/RCS 1869
 
  • S.Y. Xu, Y.W. An, J. Chen, L. Huang, M.Y. Huang, Y. Li, S. Wang
    IHEP, Beijing, People’s Republic of China
  • H.Y. Liu, X.H. Lu
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  The China Spallation Neutron Source (CSNS) is an accelerator-based science facility. CSNS is designed to accelerate proton beam pulses to 1.6 GeV kinetic energy, striking a solid metal target to produce spallation neutrons. CSNS has two major accelerator systems, a linear accelerator (80 MeV Linac) and a 1.6 GeV rapid cycling synchrotron(RCS). The RCS accumulates and accelerates the proton beam to 1.6 GeV and then extracts the beam to the target at the repetition rate of 25 Hz. The Beam commissioning of CSNS/RCS had been started since April 2017. The most important issue in high-power beam commissioning is the beam loss control, as well as the control of induced activities, to meet the requirement of manual maintenance. A series of beam loss optimization work had been done to reduce the uncontrolled beam loss. At the end of February 2020, the CSNS reached the design beam power of 100 kW with very low uncontrolled beam loss.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB196  
About • paper received ※ 19 May 2021       paper accepted ※ 31 May 2021       issue date ※ 28 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB199 Study on the Important Technologies of 300MeV Upgrade for the CSNS Injection System 3089
 
  • M.Y. Huang, C.D. Deng, L. Kang, L. Liu, Y. Liu, X. Qi, S. Wang, Q.B. Wu, Y.W. Wu, S.Y. Xu, W.Q. Zhang, Y.L. Zhang
    IHEP, Beijing, People’s Republic of China
  • J.X. Chen, T. Huang, H.C. Liu
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  Funding: This work was supported by National Natural Science Foundation of China (Project Nos. U1832210 and 12075134).
The China Spallation Neutron Source (CSNS-I) have achieved the design goal of 100kW beam power on the target in Feb., 2020. As the second phase of the CSNS, CSNS-II will achieve a beam power on the target of 500 kW. The injection energy of CSNS-II will be increased from 80 MeV to 300 MeV and the average beam current of the Linac will increase 5 times. Therefore, the injection system will require a complete upgrade. In this paper, the design scheme of the injection system for CSNS-II will be introduced. The key technologies of the upgrade injection system will be carefully analyzed and pre-developed, such as the pulse power supplies and their magnets, the special-shaped ceramic vacuum chambers, the main stripping foil, the stripped electron collection, and so on.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB199  
About • paper received ※ 17 May 2021       paper accepted ※ 09 June 2021       issue date ※ 21 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB200 Study on the Measurement and Residual Dose of the CSNS Stripping Foil 3093
 
  • M.Y. Huang, L. Kang, S. Wang, Q.B. Wu, S.Y. Xu, Y.L. Zhang
    IHEP, Beijing, People’s Republic of China
  • J.X. Chen, W.L. Huang, H.C. Liu
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  Funding: This work was supported by National Natural Science Foundation of China (Project Nos. 12075134 and U1832210).
In this paper, firstly, the application and service life of the main stripping foil for the China Spallation Neutron Source (CSNS) were introduced. The stripping efficiency of the main stripping foil have been measured and studied. Then, by using the codes FLUKA and ORBIT, the particle scattering of the main stripping foil has been simulated and the theoretical residual doses in the injection region caused by the foil scattering were obtained. By weekly measurement of the residual doses in the injection region, the actual residual doses near the main stripping foil were given. The residual doses comparison results have confirmed that the particle scattering of the main stripping foil is the most important source of the residual doses in the injection region.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB200  
About • paper received ※ 09 May 2021       paper accepted ※ 25 August 2021       issue date ※ 23 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB185 Solution to Beam Transmission Decline in the CSNS Linac Operation Using Measurements and Simulations 4134
 
  • J. Peng, M.T. Li, X.H. Lu, X.B. Luo
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • Y.W. An, S. Fu, L. Huang, M.Y. Huang, Y. Li, Z.P. Li, S. Wang, S.Y. Xu, Y. Yuan
    IHEP, Beijing, People’s Republic of China
 
  The CSNS linac operation at its design average power currently. However, the beam transmission is declining and the beam loss is increasing during the operation. With simulations and experiments, we found there is a long longitudinal tail exist in the beam bunch output from the RFQ. And this tail caused the beam loss in the following linac. After inhibition of the longitudinal tail in the beam bunch, the beam transmission in operation can keep stable.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB185  
About • paper received ※ 19 May 2021       paper accepted ※ 01 July 2021       issue date ※ 02 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)