MOPAB045 Measurements and Simulations of High Charge Beam in the APS Booster 197
 
  • J.R. Calvey, J.C. Dooling, K.C. Harkay, K.P. Wootton, C. Yao
    ANL, Lemont, Illinois, USA
 
  For the APS-Upgrade, swap-out injection will require the booster to support up to 17 nC bunch charge, several times what is used in the present APS. Booster injection efficiency drops sharply at high charge, and is the present bottleneck limiting high charge transport through the injectors. Particle tracking simulations have been used to understand what causes are limiting the injection efficiency, and to guide plans for improving it. In particular, bunch length blowup in the injected beam and beam loading in the RF cavities have been identified as the biggest factors. Simulations and measurements have also been done to characterize beam properties along the booster energy ramp. So far, a bunch charge of 12 nC has been successfully extracted from the booster.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB045  
About • paper received ※ 19 May 2021       paper accepted ※ 26 July 2021       issue date ※ 16 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB046 Plan for Operating the APS-Upgrade Booster with a Frequency Sweep 201
 
  • J.R. Calvey, T.G. Berenc, A.R. Brill, L. Emery, T. Fors, K.C. Harkay, T.J. Madden, N. Sereno, U. Wienands
    ANL, Lemont, Illinois, USA
  • A. Gu
    UCB, Berkeley, California, USA
 
  The APS-Upgrade presents several challenging demands to the booster synchrotron. Swap-out injection requires the booster to capture a high charge bunch (up to 17 nC), accelerate it to 6 GeV, and maintain a low emittance at extraction for injection into the storage ring. To accommodate these conflicting demands, the RF frequency will be ramped between injection and extraction. However, the RF cavity tuners will remain static, which means the couplers will need to withstand a high reflected power at extraction. This paper presents a plan for a system that will meet the requirements for injection efficiency, extracted emittance, and equivalent power at the coupler. Results from tracking simulations and beam studies with a frequency ramp will also be shown.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB046  
About • paper received ※ 28 May 2021       paper accepted ※ 02 June 2021       issue date ※ 26 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB123 Radiation Safety Considerations For The APS Upgrade Injector 445
 
  • K.C. Harkay, J.R. Calvey, S. Chitra, G.I. Fystro, M.J. Henry, E.E. Heyeck, B.J. Micklich, K.P. Wootton
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
The Advanced Photon Source Upgrade (APS-U) is a high-performance fourth-generation storage ring light source based on multibend achromat optics. As such, APS-U will require on-axis injection. The injectors will need to supply full-current bunch replacement in the ring; therefore, the injected bunch charge will be up to five times higher than what is typical for APS. A program was conducted to measure the radiation dose above the injector transport line to the APS storage ring for both normal operation conditions and controlled loss scenarios. Standard survey meters were used to record the dose. A review of the dose data identified opportunities to minimize the potential dose under normal APS-U high charge operation and fault conditions; these include improving the supplemental shielding and adding engineered controls. In addition, the dose data provide a benchmark for evaluating new radiation monitors for APS-U.
 
poster icon Poster MOPAB123 [1.317 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB123  
About • paper received ※ 18 May 2021       paper accepted ※ 24 May 2021       issue date ※ 12 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB065 Experimental Verification of the Source of Excessive Helical SCU Heat Load at APS 3904
 
  • V. Sajaev, J.C. Dooling, K.C. Harkay
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under Contract No. DE-AC02-06CH11357.
Immediately after the installation of the Helical superconducting undulator (HSCU) in the APS storage ring, higher than expected heating was observed in the cryogenic cooling system. Steering the electron beam orbit in the upstream dipole reduced the amount of synchrotron radiation reaching into the HSCU and allowed the device to properly cool and operate. The simplest explanation of the excessive heat load was higher than expected heat transfer from the vacuum chamber to the magnet coils. However, modeling of the synchrotron radiation interaction with the HSCU vacuum chamber showed that Compton scattering could also result in synchrotron radiation penetrating the vacuum chamber and depositing energy directly into the HSCU coils**. In this paper, we present experimental evidence that the excessive heat load of the HSCU coils is not caused by the heat transfer from the vacuum chamber but resulted from the synchrotron radiation penetrating the vacuum chamber.
* M. Kasa et. al., Phys. Rev. AB, v. 23 050701 (2020)
** J. Dooling et. al., IPAC 2019 Proc., THPTS093 (2019)
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB065  
About • paper received ※ 12 May 2021       paper accepted ※ 02 September 2021       issue date ※ 16 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)