Paper | Title | Page |
---|---|---|
MOPAB001 | Power Deposition in Superconducting Dispersion Suppressor Magnets Downstream of the Betatron Cleaning Insertion for HL-LHC | 37 |
|
||
Funding: Research supported by the HL-LHC project The power deposited in dispersion suppressor magnets downstream of the Large Hadron Collider (LHC) betatron cleaning insertion is governed by off-momentum particles scattered out of the primary collimators. In order to mitigate the risk of magnet quenches during periods of short beam lifetime in future High-Luminosity (HL-LHC) operation, new dispersion suppressor (DS) collimators are considered for installation (one per beam). In this paper, we present FLUKA simulations for both protons and Pb ions at 7 TeV, predicting the power deposition in the DS magnets, including the new higher-field dipoles 11T which are needed to integrate the collimator in the cold region next to the cleaning insertion. The simulated power deposition levels for the adopted HL-LHC collimator configuration and settings are used to assess the quench margin by comparison with the present estimated quench levels. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB001 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 07 July 2021 issue date ※ 16 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |