Paper |
Title |
Page |
WEPAB038 |
Commissioning of a New X-Band, Low-Noise LLRF System |
2683 |
|
- A.V. Edwards, M. Boronat Arevalo, N. Catalán Lasheras, G. McMonagle
CERN, Meyrin, Switzerland
- A.C. Dexter
Cockcroft Institute, Lancaster University, Lancaster, United Kingdom
|
|
|
To increase beam energy in the CLEAR facility at CERN and study the CLIC accelerating structure prototype in operating conditions, the first X-band test facility at CERN was upgraded in 2020. Both, the acquisition and software systems at X-band test stand 1 (Xbox1) were upgraded to exhibit low phase noise which is relevant to klystron based CLIC and to the use of crab cavities in the beam delivery system. The new LLRF uses down-conversion which necessitates a local oscillator which can be produced by two different methods. The first is a PLL, a commonly used technique which has been previously employed at the other X-band facilities at CERN. The second is a novel application of a single sideband up-convertor. The up-convertor system has demonstrated reduced phase noise when compared with the PLL. The commissioning of the new system began in late 2020 with the conditioning of a 50 MW Klystron. Measurements of the quality of the new LLRF will be shown. These will compare the PLL and up-convertor with particular attention on the quality of the phase measurements. Also, a preliminary study of phase shifts in the waveguide network due to temperature changes will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB038
|
|
About • |
paper received ※ 13 May 2021 paper accepted ※ 05 July 2021 issue date ※ 20 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAB076 |
High-Gradient Breakdown Studies of an X-Band Accelerating Structure Operated in the Reversed Taper Direction |
1543 |
|
- X.W. Wu, N. Catalán Lasheras, A. Grudiev, G. McMonagle, I. Syratchev, W. Wuensch
CERN, Meyrin, Switzerland
- M. Boronat
IFIC, Valencia, Spain
- A. Castilla, A.V. Edwards, W.L. Millar
Lancaster University, Lancaster, United Kingdom
|
|
|
The results of high-gradient tests of a tapered X-band traveling-wave accelerator structure powered in reversed direction are presented. Powering the tapered structure from the small aperture, normally output, at the end of the structure provides unique conditions for the study of gradient limits. This allows high fields in the first cell for a comparatively low input power and a field distribution that rapidly falls off along the length of the structure. A maximum gradient of 130 MV/m in the first cell at a pulse length of 100 ns was reached for an input power of 31.9 MW. Details of the conditioning and operation at high-gradient are presented. Various breakdown rate measurements were conducted at different power levels and rf pulse widths. The structure was standard T24 CLIC test structure and was tested in Xbox-3 at CERN.
|
|
|
Poster TUPAB076 [1.077 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB076
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 12 July 2021 issue date ※ 12 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|