Paper | Title | Page |
---|---|---|
MOPAB133 | Recovering the Positron Beam After Muon Production in the Lemma Muon Source | 470 |
|
||
In the LEMMA muon source proposal* a positron beam at 45 GeV is used to produce muons at threshold by interaction with some targets. In order to release the required intensity on the main positron source, orders of magnitude higher than the state of the art, the possibility to recover the primary positron beam after the interaction with the targets was studied. The particles distribution, with a strongly degraded energy spread after the interac- tion, was injected back into a low emittance, large energy acceptance 45 GeV ring. Studies of injection efficiency were performed. The possibility of compressing the beam in a linac before injection was also studied. As a result, even without compression, about 80% of the disrupted e+ beam can be injected back into the ring.
* D. Alesini et al, "Positron driven muon source for a muon collider", arXiv:1905.05747v2 [physics.acc-ph], May 2019 |
||
Poster MOPAB133 [4.171 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB133 | |
About • | paper received ※ 17 May 2021 paper accepted ※ 24 May 2021 issue date ※ 20 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAB033 | Photocathode Stress Test Bench at INFN LASA | 1413 |
|
||
In the framework of the preparatory activities to the BriXSino project, a test bench for testing Cs2Te photocathode at 100 MHz laser repetition rate has been installed at INFN LASA. This high repetition operation mode is foreseen to be the base operation mode of BriXSino and a qualification of the Cs2Te photocathodes is a key component. While we are not at full specification due to the limited HV of the present DC gun, we discuss the status of the test bench and the initial results. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB033 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 27 May 2021 issue date ※ 19 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |