Author: Doucet, F.
Paper Title Page
MOPAB205 Minerva (MYRRHA Phase 1) RFQ Beam Commissioning 675
 
  • A. Gatera, J. Belmans, F. Davin, W. De Cock, F. Doucet, L. Parez, F. Pompon, A. Ponton, D. Vandeplassche
    SCK•CEN, Mol, Belgium
  • F. Bouly
    LPSC, Grenoble Cedex, France
  • C. Joly, L. Perrot
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • H. Podlech
    IAP, Frankfurt am Main, Germany
  • J. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
  • C. Zhang
    GSI, Darmstadt, Germany
 
  Funding: Part of this work was supported by the European Commission Framework Programme H2020, MYRTE project nr. 662186
The MYRRHA project aims at coupling a 600 MeV proton accelerator to a subcritical fission core operating at a thermal power of 60 MW. The nominal proton beam for this ADS has an intensity of 4 mA and is delivered in a quasi-CW mode. Phase 1 of the project will realize a 100 MeV, 4 mA superconducting linac with the mission of ensuring the ADS requirements in terms of reliability and fault tolerance. As part of the reliability optimization program the integrated prototyping of the MINERVA injector is ongoing. The front-end of the injector is composed of an ECR proton source, a 2.6 m long LEBT (low energy beam transport line) and a four-rod RFQ accelerating the beam to 1.5 MeV. The present contribution focuses on the current beam tests on the RFQ, including beam matching, RF conditioning, assessment of the cavities’ performances and accelerated beam characterisation.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB205  
About • paper received ※ 19 May 2021       paper accepted ※ 31 May 2021       issue date ※ 24 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)