Author: de Sa, F.H.    [de Sá, F.H.]
Paper Title Page
MOXA03 Sirius Commissioning Results and Operation Status 13
 
  • L. Liu, M.B. Alves, A.C.S. Oliveira, X.R. Resende, F.H. de Sá
    LNLS, Campinas, Brazil
 
  Sirius is a 4th generation 3 GeV synchrotron light source that has just finalized the first commissioning phase at the Brazilian Center for Research in Energy and Materials (CNPEM) campus in Campinas, Brazil. This paper describes the main Accelerator Physics issues faced during the storage ring commissioning, methods that were used to work them out and the current operation status of the machine.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOXA03  
About • paper received ※ 20 May 2021       paper accepted ※ 10 June 2021       issue date ※ 16 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB219 Equilibrium and Nonlinear Beam Dynamics Parameters From Sirius Turn-by-Turn BPM Data 1935
 
  • X.R. Resende, M.B. Alves, L. Liu, F.H. de Sá
    LNLS, Campinas, Brazil
 
  A considerable amount of beam information is conveyed by Turn-by-Turn (TbT) data of Beam Position Monitors (BPM). In this work such data sets are analyzed for Sirius, the Brazilian 4th Generation 3GeV synchrotron light source. In particular, equilibrium and non-linear beam dynamics parameters determining decoherence patterns in TbT position data are estimated and compared with corresponding values of the nominal storage ring model.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB219  
About • paper received ※ 20 May 2021       paper accepted ※ 23 June 2021       issue date ※ 15 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB259 High Level Applications for Sirius Accelerators Control 4314
 
  • A.C.S. Oliveira, M.B. Alves, L. Liu, X.R. Resende, F.H. de Sá
    LNLS, Campinas, Brazil
 
  Sirius is a 4th generation 3 GeV synchrotron light source that has just finalised the first commissioning phase at the Brazilian Center for Research in Energy and Materials (CNPEM) campus in Campinas, Brazil. The large number of process variables and large complexity of the subsystems in this type of machine requires the development of tools to simplify the commissioning and operation of the accelerators. This paper describes some of the high level control tools developed for the accelerators commissioning and future operation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB259  
About • paper received ※ 19 May 2021       paper accepted ※ 13 July 2021       issue date ※ 21 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)