TUPAB372 |
Status of the Quadrupole Doublet Module Series Manfacturing |
2388 |
|
- T. Winkler, A. Bleile, L.H.J. Bozyk, V.I. Datskov, J. Ketter, P. Kowina, J.P. Meier, N. Pyka, C. Roux, P.J. Spiller, K. Sugita, A. Waldt, St. Wilfert
GSI, Darmstadt, Germany
|
|
|
The 83 Quadrupole Doublet Modules (QDM) for the heavy-ion-synchrotron SIS100 of the FAIR project at GSI are highly integrated cryogenic modules containing multiple magnets. Each of eleven different QDM types consists of two units, where one unit consists of one quadrupole magnet as well as corrector magnets depending on the modules position in the accelerator Ion-Optical Lattice. Additionally, the QDMs contain cryogenic collimators, beam diagnostics, as well as cryogenic UHV beam pipes. The modules contain parts from multiple suppliers increasing the logistics behinds the QDMs design further. We present the process of the module integration, give details on the current integration status and present an outlook on the timeline for the QDM integration planning.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB372
|
|
About • |
paper received ※ 18 May 2021 paper accepted ※ 02 June 2021 issue date ※ 21 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAB380 |
Testing of the First of Series Quadrupole Doublet Module for the SIS100 Synchrotron |
2409 |
|
- P. Aguar Bartolome, M. Al Ghanem, M. Becker, A. Bleile, R. Bluemel, L.H.J. Bozyk, V.I. Datskov, W. Freisleben, A. Kario, P. Kowina, K.K. Kozlowski, F. Kurian, S. Lindner, J.P. Meier, T. Miertsch, S.S. Mohite, V.P. Plyusnin, I. Pongrac, C. Roux, C. Schroeder, P.J. Spiller, K. Sugita, A. Szwangruber, P.B. Szwangruber, F. Walter, H. Welker, St. Wilfert, T. Winkler, S. Zeller
GSI, Darmstadt, Germany
|
|
|
A new international facility for antiproton and ion research (FAIR) is currently under construction in Darmstadt, Germany. The high intensity primary beam required for different research experiments will be provided by the SIS100 heavy ion synchrotron. The synchrotron is composed of fast cycling superconducting magnets from which about 300 will be integrated in Quadrupole Doublet Modules (QDM). Each module consists of two units composed of a quadrupole and corrector magnets. The First of Series Quadrupole Doublet Module was delivered to the test facility at GSI in November 2019. The assembled doublet was subjected to a dedicated test program to verify the functionality of the module components at cryogenic temperature and operating conditions. The results obtained during the testing campaign will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB380
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 18 June 2021 issue date ※ 02 September 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|