Author: Clementi, R.
Paper Title Page
WEPAB314 TEX - an X-Band Test Facility at INFN-LNF 3406
 
  • S. Pioli, D. Alesini, F.A. Anelli, M. Bellaveglia, S. Bini, B. Buonomo, S. Cantarella, F. Cardelli, G. Catuscelli, R. Ceccarelli, A. Cecchinelli, F. Chiarelli, P. Ciuffetti, R. Clementi, C. Di Giulio, E. Di Pasquale, G. Di Raddo, M. Diomede, A. Esposito, L. Faillace, A. Falone, G. Franzini, A. Gallo, S. Incremona, A. Liedl, D. Pellegrini, G. Piermarini, L. Piersanti, S. Quaglia, R. Ricci, L. Sabbatini, M. Scampati, G. Scarselletta, A. Stella, R. Zarlenga
    INFN/LNF, Frascati, Italy
 
  Funding: The LATINO project is co-funded by the Regione Lazio within POR-FESR 2014-2020 European activities (public call "Open Research Infrastructures").
We report the status of the development of an High Power RF Laboratory in X-Band called TEX (TEst-stand for X-Band). TEX is part of the LATINO (Laboratory in Advanced Technologies for INnOvation) initiative that is ongoing at the Frascati National Laboratories (LNF) of the Italian Institute for Nuclear Physics (INFN) that covers many different areas focused on particle accelerator technologies. TEX is a RF test facility based on solid-state K400 modulator from ScandiNova with a 50MW class X-band (11.996 GHz) klystron tube model vkx 8311a operating at 50 Hz. This RF source will operate as resource for test and research programs such as the RF breakdown on RF waveguide components as well as high power testing of accelerating structures for future high gradient linear accelerator such as EuPRAXIA and CLIC. The high power testing will be performed in a dedicated brand-new bunker that has been recently built. RF system, vacuum controls and safety equipments are currently being installed. The first accelerating structure testing is scheduled by beginning 2022. In this document design and tests for all the sub-systems of the facility will be presented and discussed.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB314  
About • paper received ※ 19 May 2021       paper accepted ※ 28 July 2021       issue date ※ 19 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB113 The Extended Operative Range of the LNF LINAC and BTF Facilities 3987
 
  • L.G. Foggetta, M. Belli, B. Buonomo, F. Cardelli, R. Ceccarelli, A. Cecchinelli, R. Clementi, D. Di Giovenale, C. Di Giulio, G. Piermarini, L.A. Rossi, S. Strabioli, R. Zarlenga
    INFN/LNF, Frascati, Italy
 
  Funding: These activities has been partially supported by AIDA-2020 Grant Agreement 654168 and ERAD projects.
In 2020 the INFN-LNF LINAC and BTF have performed long-term runs for test beams and fixed-target experiments. The scientific needs of these items have been leading our groups to continuous improvements of the LINAC operative range both in pulse time at maximum energy and on the minimum transported energy, until the reset to DAΦNE injections at the beginning of 2021. We will also show the BTF recent developments in the transported beams and the second line installation.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB113  
About • paper received ※ 19 May 2021       paper accepted ※ 27 July 2021       issue date ※ 27 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)