Author: Chirpaz-Cerbat, D.
Paper Title Page
TUPAB016 ESS RFQ: Installation and Tuning at Lund 1372
 
  • P. Hamel, D. Chirpaz-Cerbat, M. Desmons, A.C. France, O. Piquet
    CEA-IRFU, Gif-sur-Yvette, France
  • A. Dubois, Y. Le Noa
    CEA-DRF-IRFU, France
 
  The 352 MHz Radio Fre­quency Quadru­pole (RFQ) for the Eu­ro­pean Spal­la­tion Source ERIC (ESS) has been de­liv­ered by the end of 2019. It has been pro­vided by CEA, IRFU, Saclay/France. It con­sists of five sec­tions with a total length of 4.6 m and ac­cel­er­ates the 70 mA pro­ton beam from 75 keV up to 3.6 MeV. It will be fed with 900 kW peak power through two coax­ial loop cou­plers. The in­stal­la­tion process (align­ment, vac­uum test), as well as the tun­ing process based on bead-pull mea­sure­ments, is pre­sented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB016  
About • paper received ※ 18 May 2021       paper accepted ※ 06 July 2021       issue date ※ 14 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)