Paper |
Title |
Page |
WEPAB001 |
Accelerator Challenges of the LHeC Project |
2570 |
|
- B.J. Holzer, K.D.J. André, O.S. Brüning
CERN, Geneva, Switzerland
- S.A. Bogacz
JLab, Newport News, Virginia, USA
- M. Klein
The University of Liverpool, Liverpool, United Kingdom
|
|
|
The LHeC project studies the design of a future electron-proton collider at CERN that will run in parallel to the standard LHC operation. For this purpose, the existing LHC storage ring will be combined with an Energy Recovery Linac (ERL), to accelerate electrons up to kinetic energy of 50 GeV. This concept - also applicable to the FCC-eh collider and studied at the PERLE project as prototype version - allows a peak luminosity of 1034 cm-2 s-1. A sophisticated design of the RF structures, linacs, arcs, and interaction region is required. The electrons are accelerated and, after the interaction point, their energy is recovered through the same RF structures. While this energy recovery concept is a very promising approach, severe challenges are set by the layout of the interaction region, the beam separation concept and the design of the linac and arc lattice for the highest possible momentum acceptance. Emittance control and beam-beam effect of both, electron and proton beams, have been studied in front-to-end simulations and will be presented. We summarise the design principles of the ERL, the optimization of the arc lattice, and the main parameters of the project.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB001
|
|
About • |
paper received ※ 17 May 2021 paper accepted ※ 21 June 2021 issue date ※ 21 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPAB376 |
The Inner Triplet String Facility for HL-LHC: Design and Planning |
3592 |
|
- M.B. Bajko, S. Bertolasi, C. Bertone, S. Blanchard, D. Bozzini, O.S. Brüning, P. Cruikshank, D. De Luca, N. Dos Santos, F. Dragoni, N. Heredia Garcia, A. Herty, A. Kosmicki, S. Le Naour, W. Maan, A. Martínez Sellés, P. Martinez Urios, P. Orlandi, A. Perin, M. Pojer, F. Rodriguez-Mateos, G. Rolando, L. Rossi, H. Thiesen, E. Todesco, E. Vergara Fernandez, D. Wollmann, S. Yammine, J.J. Zawilinski, M. Zerlauth
CERN, Meyrin, Switzerland
|
|
|
In the framework of the HL-LHC project, full-scale integration and operational tests of the superconducting magnet chain, from the inner triplet quadrupoles up to the first separation/recombination dipole, are planned in conditions as similar as possible to the final set-up in the LHC tunnel. The IT String includes all of the required systems for operation at nominal conditions, such as vacuum, cryogenics, warm and cold powering equipment, and protection systems. The IT String is intended to be both an assembly, and an integration test stand, and a full rehearsal of the systems working in unison. It will, closely reproducing the mechanical, electrical, and thermo-hydraulic interfaces of the final installation, as well as allowing a full rehearsal of the systems working in unison. This paper describes the conceptual design, the test stand’s reference configuration, and the main goals. It also summarizes the status of the main activities, including the detailed design of the test infrastructure, procurement of main equipment, the baseline installation schedule, and major milestones. The first version of the experimental program and the associated planning are also presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB376
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 22 July 2021 issue date ※ 22 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|