Author: Bleile, A.
Paper Title Page
TUPAB372 Status of the Quadrupole Doublet Module Series Manfacturing 2388
 
  • T. Winkler, A. Bleile, L.H.J. Bozyk, V.I. Datskov, J. Ketter, P. Kowina, J.P. Meier, N. Pyka, C. Roux, P.J. Spiller, K. Sugita, A. Waldt, St. Wilfert
    GSI, Darmstadt, Germany
 
  The 83 Quadrupole Doublet Modules (QDM) for the heavy-ion-synchrotron SIS100 of the FAIR project at GSI are highly integrated cryogenic modules containing multiple magnets. Each of eleven different QDM types consists of two units, where one unit consists of one quadrupole magnet as well as corrector magnets depending on the modules position in the accelerator Ion-Optical Lattice. Additionally, the QDMs contain cryogenic collimators, beam diagnostics, as well as cryogenic UHV beam pipes. The modules contain parts from multiple suppliers increasing the logistics behinds the QDMs design further. We present the process of the module integration, give details on the current integration status and present an outlook on the timeline for the QDM integration planning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB372  
About • paper received ※ 18 May 2021       paper accepted ※ 02 June 2021       issue date ※ 21 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB378 Superconducting Dipole Magnets for the SIS100 Synchrotron 2401
 
  • F. Kaether, P. Aguar Bartolome, A. Bleile, G. Golluccio, J. Ketter, P. Kosek, F. Kurian, V. Marusov, J.P. Meier, S.S. Mohite, C. Roux, P.J. Spiller, K. Sugita, A. Szwangruber, P.B. Szwangruber, A. Warth, H.G. Weiss
    GSI, Darmstadt, Germany
 
  The Facility for Antiproton and Ion Research (FAIR) is currently under construction at GSI Darmstadt, Germany. For its main accelarator, the SIS100 synchrotron, 110 superconducting dipole magnets has been produced and extensively tested. The fast-ramped Nuclotron-type superferric dipoles were manufactured with high effort regarding a precise magnetic field which could be proven by magnetic field measurements with high accuracy. Stable operation conditions at 4.5 K were achieved including an excellent quench behaviour and precise geometrical and electrical properties. An overview on design, production, operation, tests and measurement results will be given.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB378  
About • paper received ※ 19 May 2021       paper accepted ※ 21 June 2021       issue date ※ 10 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB380 Testing of the First of Series Quadrupole Doublet Module for the SIS100 Synchrotron 2409
 
  • P. Aguar Bartolome, M. Al Ghanem, M. Becker, A. Bleile, R. Bluemel, L.H.J. Bozyk, V.I. Datskov, W. Freisleben, A. Kario, P. Kowina, K.K. Kozlowski, F. Kurian, S. Lindner, J.P. Meier, T. Miertsch, S.S. Mohite, V.P. Plyusnin, I. Pongrac, C. Roux, C. Schroeder, P.J. Spiller, K. Sugita, A. Szwangruber, P.B. Szwangruber, F. Walter, H. Welker, St. Wilfert, T. Winkler, S. Zeller
    GSI, Darmstadt, Germany
 
  A new international facility for antiproton and ion research (FAIR) is currently under construction in Darmstadt, Germany. The high intensity primary beam required for different research experiments will be provided by the SIS100 heavy ion synchrotron. The synchrotron is composed of fast cycling superconducting magnets from which about 300 will be integrated in Quadrupole Doublet Modules (QDM). Each module consists of two units composed of a quadrupole and corrector magnets. The First of Series Quadrupole Doublet Module was delivered to the test facility at GSI in November 2019. The assembled doublet was subjected to a dedicated test program to verify the functionality of the module components at cryogenic temperature and operating conditions. The results obtained during the testing campaign will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB380  
About • paper received ※ 19 May 2021       paper accepted ※ 18 June 2021       issue date ※ 02 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)