Paper |
Title |
Page |
MOPAB248 |
Injection Schemes for the SOLEIL Upgrade |
796 |
|
- M.-A. Tordeux, P. Alexandre, R. Ben El Fekih, P. Brunelle, L. Hoummi, A. Loulergue, L.S. Nadolski, R. Nagaoka
SOLEIL, Gif-sur-Yvette, France
|
|
|
Injection into the SOLEIL upgrade storage ring is much more challenging compared to the case of the current ring. Thanks to the experience gained in the development, manufacture and commissioning of a Multipole Injection Kicker (MIK) on the MAX IV 3 GeV storage ring, the SOLEIL pulsed magnet team is currently developing new MIK magnets that will serve as the basis for the injection schemes in the upgrade storage ring. We then propose two kinds of injections: firstly, a betatron off-axis injection that should be compatible with the full-coupling storage ring tuning, and secondly, a synchrotron on-axis injection by creating a large horizontal dispersion bump at the injection point.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB248
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 21 May 2021 issue date ※ 26 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPAB353 |
Design and Commissioning of a Multipole Injection Kicker for the SOLEIL Storage Ring |
3525 |
|
- R. Ollier, P. Alexandre, R. Ben El Fekih, L.S. Nadolski
SOLEIL, Gif-sur-Yvette, France
|
|
|
In third-generation synchrotron light sources, achieving an orbit distortion below 10% of the stored beam size is very challenging. The standard injection scheme of SOLEIL is made of 2 septa and 4 kicker magnets installed in a 12 m long straight section. Tuning the 4 kickers, to reduce perturbations, revealed to be almost impossible since it requires having 4 identical magnets, electronics, and Ti coated ceramic chambers. To reach the position stability requirement of the stored beam, a single pulsed magnet with no field on the stored beam path can replace the 4 kickers. Such a device, called MIK (Multipole Injection Kicker), was developed by SOLEIL and successfully commissioned in the MAX-IV 3-GeV ring as the key device used in the standard injection scheme for user operation, reducing the beam orbit distortion below 1 micron in peak value in both planes. A copy of the MIK has been installed in a short straight section of the SOLEIL storage ring, in January 2021. We report MIK positioning studies, the constraints of the project, sapphire chamber coating challenges and the first commissioning results. The R&D MIK is a demonstrator for the injection scheme of SOLEIL upgrade as well.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB353
|
|
About • |
paper received ※ 21 May 2021 paper accepted ※ 23 July 2021 issue date ※ 31 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|