Paper | Title | Page |
---|---|---|
THPAB113 | The Extended Operative Range of the LNF LINAC and BTF Facilities | 3987 |
|
||
Funding: These activities has been partially supported by AIDA-2020 Grant Agreement 654168 and ERAD projects. In 2020 the INFN-LNF LINAC and BTF have performed long-term runs for test beams and fixed-target experiments. The scientific needs of these items have been leading our groups to continuous improvements of the LINAC operative range both in pulse time at maximum energy and on the minimum transported energy, until the reset to DAΦNE injections at the beginning of 2021. We will also show the BTF recent developments in the transported beams and the second line installation. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB113 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 27 July 2021 issue date ※ 27 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |