JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


BiBTeX citation export for WEPAB365: CERN BDF Prototype Target Operation, Removal and Autopsy Steps

@inproceedings{franqueiraximenes:ipac2021-wepab365,
  author       = {R. Franqueira Ximenes and O. Aberle and C. Ahdida and P. Avigni and M. Battistin and L. Bianchi and L.R. Buonocore and S. Burger and J. Busom and M. Calviani and J.P. Canhoto Espadanal and M. Casolino and M. Di Castro and M.A. Fraser and S.S. Gilardoni and S. Girod and J.L. Grenard and D. Grenier and M. Guinchard and R. Jacobsson and M. Lamont and E. Lopez Sola and A. Ortega Rolo and A. Perillo-Marcone and Y. Pira and B. Riffaud and V. Vlachoudis and L. Zuccalli},
% author       = {R. Franqueira Ximenes and O. Aberle and C. Ahdida and P. Avigni and M. Battistin and L. Bianchi and others},
% author       = {R. Franqueira Ximenes and others},
  title        = {{CERN BDF Prototype Target Operation, Removal and Autopsy Steps}},
  booktitle    = {Proc. IPAC'21},
  pages        = {3559--3562},
  eid          = {WEPAB365},
  language     = {english},
  keywords     = {target, radiation, extraction, interface, operation},
  venue        = {Campinas, SP, Brazil},
  series       = {International Particle Accelerator Conference},
  number       = {12},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {08},
  year         = {2021},
  issn         = {2673-5490},
  isbn         = {978-3-95450-214-1},
  doi          = {10.18429/JACoW-IPAC2021-WEPAB365},
  url          = {https://jacow.org/ipac2021/papers/wepab365.pdf},
  note         = {https://doi.org/10.18429/JACoW-IPAC2021-WEPAB365},
  abstract     = {{The Beam Dump Facility (BDF), currently in the study phase, is a proposed general-purpose fixed target facility at CERN. Initially will host the Search for Hidden Particles (SHiP) experiment, intended to investigate the origin of dark matter and other weakly interacting particles. The BDF particle production target is located at the core of the facility and is employed to fully absorb the high intensity (400 GeV/c) Super Proton Synchrotron (SPS) beam. To validate the design of the production target, a downscaled prototype was tested with the beam at CERN in 2018 in the North Area primary area in a dedicated test at 35 kW average beam power. This contribution details the BDF prototype target operation, fully remote removal intervention, and foreseen post-irradiation examination plans.}},
}