BiBTeX citation export for MOPAB316: Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain

@inproceedings{roncarolo:ipac2021-mopab316,
  author       = {F. Roncarolo and S. Bart Pedersen and J.M. Belleman and D. Belohrad and M. Bozzolan and C. Bracco and S. Di Carlo and J. Emery and A. Goldblatt and A. Guerrero and S. Levasseur and A. Navarro Fernandez and E. Renner and H.S. Sandberg and J.W. Storey and J. Tan and J. Tassan-Viol},
% author       = {F. Roncarolo and S. Bart Pedersen and J.M. Belleman and D. Belohrad and M. Bozzolan and C. Bracco and others},
% author       = {F. Roncarolo and others},
  title        = {{Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain}},
  booktitle    = {Proc. IPAC'21},
  pages        = {976--979},
  eid          = {MOPAB316},
  language     = {english},
  keywords     = {linac, MMI, electron, diagnostics, instrumentation},
  venue        = {Campinas, SP, Brazil},
  series       = {International Particle Accelerator Conference},
  number       = {12},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {08},
  year         = {2021},
  issn         = {2673-5490},
  isbn         = {978-3-95450-214-1},
  doi          = {10.18429/JACoW-IPAC2021-MOPAB316},
  url          = {https://jacow.org/ipac2021/papers/mopab316.pdf},
  note         = {https://doi.org/10.18429/JACoW-IPAC2021-MOPAB316},
  abstract     = {{The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems which would provide high brightness proton beams in the rest of the injector complex. After a short overview of the newly installed diagnostics, the main focus of this paper will move to the instruments already commissioned with the beam. This will include LINAC4 diagnostics, the PSB H⁰/H⁻ monitor, the PSB Trajectory Measurement System, and the PS beam gas ionization monitor. In addition, particular emphasis will be given to the first operational experience with the new generation of fast wire scanners installed in all injector synchronous.}},
}