Paper | Title | Page |
---|---|---|
TUVIR17 |
Status of the Raon Heavy Ion Accelerator Project | |
|
||
The RAON heavy ion superconducting linac project is under way in Korea. The RAON consists of the 200 MeV/u superconducting linac delivering 400 kW of beam power to various targets to promote cutting edge science researches. The installation the accelerator components has started in May 2019. It aims to achieve the first beam by the end of 2021. The current status of the project will be presented. | ||
![]() |
|
|
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |