The circular electron positron collider (CEPC) is in pre-research, it will need more than two hundred 650MHz/800kW klystrons. The secondary electron yield (SEY) effect suppression is very important for the klystron working stable. The simulation uses an incident primary electron source and considers all the phases and power levels of the input microwave. Two methods are simulated for the SEY suppression. The groove cutting on the nose of cavities is much simple while the TiN coating can suppress better. The effect after groove cutting on nose is also simulated and the corresponding compensations are adopted. For simplify the fabrication progress as well as some experience that can be referenced, the groove cutting method is adopted finally for the first klystron prototype, which is expected to be available in the summer of 2019.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB045
|
|
About • |
paper received ※ 13 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPTS034 |
Design and Progress of Mechanical Support in HEPS |
4180 |
|
- C.H. Li, Y. Jiao, M.X. Li, H. Wang, Z. Wang, L. Wu, N. Zhou
IHEP, Beijing, People’s Republic of China
|
|
|
HEPS is a new generation synchrotron facility on construction with very low emittance. Stringent requirements are proposed to the design of mechanical support. The alignment error between girders should be less than 50μm. Based on that, the adjusting resolution of the girder are required to be less than 5μm in both transverse and vertical directions. Besides, the Eigen frequency of magnet & girder assembly should be higher than 54Hz to avoid the amplification of ground vibrations. To fulfill these requirements, studies on mechanical support design is now being carried out in HEPS. This paper will describe the design and progress of those work.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS034
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPTS041 |
Progress and TDR Plans of the Mechanical System of CEPC |
4200 |
|
- H. Wang, S. Bai, M.X. Li, Y.D. Liu, C. Meng, H. Qu, J.L. Wang, P. Zhang, N. Zhou
IHEP, Beijing, People’s Republic of China
|
|
|
The TDR of CEPC is aimed at the key science and technology problems and makes preparations for the real project. This paper will describe the progress of mechanical system including the regular supports and transport vehicle design, the mockup plan, the installation scenario of machine detector interface (MDI) and the movable collimator, as well as the TDR plans of mechanical system.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS041
|
|
About • |
paper received ※ 28 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|