Paper | Title | Page |
---|---|---|
MOPGW031 | Analysis and Correction for the Effect of Multipoles with Skewed Errors on IP Beam Dynamics in SuperKEKB | 159 |
SUSPFO039 | use link to see paper's listing under its alternate paper code | |
|
||
The beam dynamics at the interaction point (IP) in the accelerators which has the nano-beam scheme like as SuperKEKB is extremely sensitive for skewed error of final focusing magnets (QCS). As proceeding the beta squeezing in the interaction region (IR), the effect of optics aberrations at IP is enhanced. In the SuperKEKB Phase-2 commissioning, there was the problem come from skewed quadrupole fields in IR. The dominant skew parameters ‘‘R" for this problem is very hard to see directly by using beam position monitors, thus it was corrected by scanning R parameters. In the next commissioning Phase-3 which is just before the operation with the Belle II experiment, it is planned that the IP beta squeezing is going forward to design parameters which is smaller than it achieved in Phase-2 by the factor of 4 (for horizontal beta) and 10 (for vertical beta). Hence the effect of skew error will be considerable larger and it is estimated that skew sextupoles will emerge as a serious cause for the aberration from the orbit. This report is the study of analysis and correction results for the effect of QCS skewed errors in the SuperKEKB commissioning. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW031 | |
About • | paper received ※ 19 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPMP037 | Updated High-Energy LHC Design | 524 |
|
||
Funding: This work was supported in part by the European Commission under the HORIZON 2020 project ARIES no.730871, and by the Swiss Accelerator Research and Technology collaboration CHART. We present updated design parameters for a future High-Energy LHC. A more realistic turnaround time has led to a revision of the target peak luminosity, as well as a choice of a larger IP beta function, and longer physics fills. Pushed parameters of the Nb3Sn superconducting cable together with a modified layout of the 16 T dipole magnets resulted in revised field errors, updated dynamic-aperture simulations, and an associated re-evaluation of injector options. Collimators in the dispersion suppressors help achieve satisfactory cleaning performance. Longitudinal beam parameters ensure beam stability throughout the cycle. Intrabeam scattering rates and Touschek lifetime appear benign. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPMP037 | |
About • | paper received ※ 10 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |