Paper | Title | Page |
---|---|---|
MOPRB072 | eRHIC in Electron-Ion Operation | 738 |
|
||
Funding: Work supported by U.S. DOE under contract No DE-AC02-98CH10886 with the U.S. Department of Energy. The design effort for the electron-ion collider eRHIC has concentrated on electron-proton collisions at the highest luminosities over the widest possible energy range. The present design also provides for electron-nucleon peak luminosities of up to 4.7·1033 cm-2s−1 with strong hadron cooling, and up to 1.7·1033 cm-2s−1 with stochastic cooling. Here we discuss the performance limitations and design choices for electron-ion collisions that are different from the electron-proton collisions. These include the ion bunch preparation in the injector chain, acceleration and intrabeam scattering in the hadron ring, path length adjustment and synchronization with the electron ring, stochastic cooling upgrades, machine protection upgrades, and operation with polarized electron beams colliding with either unpolarized ion beams or polarized He-3. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB072 | |
About • | paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPTS114 | Upgrades for Subsystems of the 200 MeV H− Linac at BNL | 1152 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. To increase the average current for isotope production by factor of two, we have undertaken several upgrades for our 50-year-old 200 MeV H− linac. Average current will be double by increasing the beam pulse length. We are testing the DTL tanks reliability by increasing RF pulse length and replacing weak RF joints. We are in the process of replace 50-year old ion pumps and a new PLC based vacuum I&C system for the DTL tanks. We are also upgrading/replacing/adding LLRF, diagnostics, machine protection system, and quadrupole power supply. Paper will present status of these activity and future plan. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS114 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMP048 | Development of Spin Rotator and an Absolute Polarimeter for Polarized He-3 at BNL | 2440 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. EBIS Preinjector will provide longitudinally polarized 3He++ ions with about 80% polarization and 5.1011 particles per bunch at 6 MeV, which must be rotated to vertical direction before it ions are injected into the Booster. The 3He++ longitudinal polarization is first rotated to the transverse direction by the 21.5° bending magnet. Then the solenoid spin-rotator rotates the spin to the vertical direction. The spin-rotator will be a pulsed solenoid with a reversible field to enable spin flips. The vertically polarized beam will be returned back to the straight HEBT line by the system of three dipole magnets after the spin rotator solenoid. The low-energy polarimeter can be installed in the straight beam line section after the second dipole magnet. To measure transverse (vertical) polarization of the 3He beam at 5-6 MeV, the spin correlated asymmetry of 3He scattering on a 4He gas target (~5 Torr) will be measured with left/right symmetric strip detectors. Paper will present status of the project. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP048 | |
About • | paper received ※ 19 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |