Author: Wang, Y.W.
Paper Title Page
TUPTS105 High Current High Charge Magnetized and Bunched Electron Beam from a DC Photogun for JLEIC Cooler 2167
 
  • S. Zhang, P.A. Adderley, J.F. Benesch, D.B. Bullard, J.M. Grames, J. Guo, F.E. Hannon, J. Hansknecht, C. Hernandez-Garcia, R. Kazimi, G.A. Krafft, M.A. Mamun, M. Poelker, R. Suleiman, M.G. Tiefenback, Y.W. Wang
    JLab, Newport News, Virginia, USA
  • J.R. Delayen, G.A. Krafft, Y.W. Wang, S.A.K. Wijethunga
    ODU, Norfolk, Virginia, USA
 
  Funding: This project was supported by the U.S. DOE Basic Energy Sciences under contract No. DE-AC05-060R23177. Additional support comes from Laboratory Directed Research and Development program.
A high current, high charge magnetized electron beamline that has been under development for fast and efficient cooling of ion beams for the proposed Jefferson Lab Electron Ion Collider (JLEIC). In this paper, we present the latest progress over the past year that include the generation of picosecond magnetized beam bunches at average currents up to 28 mA with exceptionally long photocathode lifetime, and the demonstrations of magnetized beam with high bunch charge up to 700 pC at 10s of kHz repetition rates. Detailed studies on a stable drive laser system, long lifetime photocathode, beam magnetization effect, beam diagnostics, and a comparison between experiment and simulations will also be reported. These accomplishes marked an important step towards the essential feasibility for the JLEIC cooler design using magnetized beams.
(To be inserted)
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS105  
About • paper received ※ 15 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP053 Operational Results of Simultaneous Four-Beam Delivery at Jefferson Lab 2454
 
  • R. Kazimi, A. Freyberger, J.M. Grames, J. Hansknecht, A.S. Hofler, T.E. Plawski, M. Poelker, M.F. Spata, Y.W. Wang
    JLab, Newport News, Virginia, USA
 
  Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177.
A concept for simultaneous beam delivery to all four CEBAF experimental halls from a single injector and a single main accelerator for the 12 GeV era was proposed in 2012. The original 12 GeV beam delivery plan was for a maximum of three experimental halls at a time as in the 6 GeV era. Therefore, the new concept increases the po-tential beam time for the experiments up to 33%. This change, although a major improvement in operational capabilities, required only limited modifications to the existing machine. The modifications were mainly timing and pattern changes to the beams in the injector, adding a fourth laser to the photo-cathode gun, and the addition of new RF separators to the highest pass of CEBAF. These changes are now complete and, for the first time, the full system is operating, producing four simultaneous beams through the accelerator to four different destinations. In this paper, in addition to presenting the results of the full system commissioning, we will discuss important details about the new configuration plus some of our operational challenges.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP053  
About • paper received ※ 14 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)