Paper | Title | Page |
---|---|---|
TUPRB055 | First Results of the IVU16 Prototype Undulator Measurements | 1808 |
|
||
The Shanghai Synchrotron Radiation Facility (SSRF) has developed a 16 mm period length, 4 mm gap, in-vacuum undulator (IVU) that is planned to be installed and tested in the 1.5 GeV SXFEL-SBP beam line. This paper will describe the main parameters of the undulator and the key design choices that have been made. The first undulator prototype was assembled and magnetically tested. First measurements with vacuum chamber will be presented. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPRB055 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |