Paper | Title | Page |
---|---|---|
MOPTS003 | Superconducting LINAC Design Upgrade in View of the 100 MeV MYRRHA Phase I | 837 |
|
||
Funding: Part of this work supported by the European Atomic Energy Community (EURATOM) H2020 Programme under grant agreement n°662186 (MYRTE project). The goal of the MYRRHA project is to demonstrate the technical feasibility of transmutation in a 100 MW Accelerator Driven System (ADS) by building a new flexible irradiation complex at Mol (Belgium). The MYRRHA facility requires a 600 MeV accelerator delivering a maximum proton current of 4 mA in continuous wave operation, with an additional requirement for exceptional reliability. Supported by SCK•CEN and the Belgium government the project has entered in its phase I: which consists in the development and the construction of the linac first part, up to 100 MeV. We review the design updates of the superconducting linac, with its enhanced fault-tolerance capabilities. The linac capabilities at 100 MeV (Phase I) and 600 MeV (ADS operation) are exposed and discussed. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS003 | |
About • | paper received ※ 23 April 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPTS006 | Final Results of the SPIRAL2 Injector Commissioning | 848 |
|
||
The SPIRAL2 injector, made up of a 5 mA p-d ion source, a 1 mA heavy ion source (up to A/Q = 3) and a CW 0.75 MeV/u RFQ, has been commissioned in parallel with the superconducting linac installation. This com-missioning is successfully completed now and the Diag-nostic plate (D-plate) used to characterize the injector beams is removed. This paper presents the results ob-tained with the reference particles (H+, 4He2+, 18O6+ and 40Ar14+) and a comparison with the simulations. The connexion to the SC linac and the future linac beam commissioning is briefly described. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS006 | |
About • | paper received ※ 12 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTS007 | SPIRAL2 RFQ Bunch Length and Longitudinal Emittance Measurements. | 1944 |
|
||
The SPIRAL2 RFQ is designed to accelerate light and heavy ions up to A/Q=3 in CW mode to 0.75MeV/u. During its commissioning, the bunch lengths measured using a Beam Extension Monitor were compared with simulations for different ion species (Proton, Helium, Oxygen, Argon). The longitudinal emittances measured using the 3 gradients method and a multiparticule optimization method were also compared successfully to the expected ones. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS007 | |
About • | paper received ※ 19 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPRB010 | RF Power Test of the Rebuncher for Saraf-Linac | 2815 |
|
||
Funding: SNRC Three normal conducting rebunchers will be installed at the Medium Energy Beam Transport (MEBT) of the SARAF-LINAC phase II [saraf]. The MEBT line is designed to follow a 1.3 MeV/u RFQ, is about 5 m long, and contains three 176 MHz rebunchers providing a field integral of 105 kV. CEA is in charge of the design and fabrication of the Cu plated stainless steel, 3-gap rebuncher. The high power tests and RF conditioning have been successfully performed at the CEA Saclay on the first cavity. A solid state power amplifier, which has been developed by SNRC and has been used for the RF tests. The cavity has shown a good performance according to calculations, regarding the dissipated power, peak temperatures and coupling factor. RF conditioning was started with a duty cycle of 1\% and increased gradually until continuous wave (CW), which is the nominal working mode in SARAF-LINAC. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB010 | |
About • | paper received ※ 09 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPTS006 | Modelization of an Injector With Machine Learning | 3096 |
|
||
Modern particle accelerator projects, such as MYRRHA, have very high stability and/or reliability requirements. To meet those, it is necessary to optimize or develop new methods for the control systems. One of the difficulties lies in the relatively long computation time of current beam dynamics codes. In this context, the very low computation time of neural network is of great attraction. However, a neural network has to be trained in order to be of any use. The training of a beam dynamic predictor uses a large dataset (experimental or simulated) that represents the dynamics over the parameter space of interest. Therefore, choosing the right training dataset is crucial for the quality of the neural network predictions. In this work, a study on the sampling choice for the training data is performed to train a neural network to predict the transmission of a beam through a low energy beam transport line and a Radiofrequency Quadrupole. We show and discuss the results obtained on training data set to model the IPHI and MYRRHA injectors.
https://myrrha.be/ |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS006 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPTS116 | The SARAF-LINAC Project 2019 Status | 4352 |
|
||
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC solenoid-Package have been tested recently. Meanwhile, the cryomodules technical specifications have been written and called for tender. This paper presents the status of the SARAF-LINAC Project at April 2019. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS116 | |
About • | paper received ※ 13 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |