Author: Tomizawa, M.
Paper Title Page
WEPMP007 Current Status of Slow Extraction from J-PARC Main Ring 2311
 
  • R. Muto, Y. Arakaki, T. Kimura, S. Murasugi, M. Okada, K. Okamura, T. Shimogawa, Y. Shirakabe, M. Tomizawa, T. Toyama, E. Yanaoka
    KEK, Ibaraki, Japan
  • A. Matsumura
    Nihon Advanced Technology Co., Ltd, Ibaraki, Nakagun, Tokaimura, Japan
 
  A 30 GeV proton beam accelerated in the J-PARC Main Ring (MR) is slowly extracted by the third integer resonant extraction and delivered to the hadron experimental hall. The slow extraction (SX) from the MR has unique characteristics that can be used to obtain a low beam loss rate. A dynamic bump scheme under achromatic condition drastically reduces beam hit rate on the septa devices. We have attained 50 kW SX operation at 5.2s cycle in current physics run. Slow extraction efficiency has been achieved to be very high, 99.5%. A beam instability during debunching with beam loss can be suppressed by a unique RF phase offset technique at MR injection. A spill duty factor indicating a uniformity for time structure of the extracted beam is typically 50%, which can be obtained by a feedback system using fast response quadrupoles, applying transverse RF field and so on. Future plans to improve present SX performances will be introduced.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP007  
About • paper received ※ 01 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP010 8 Gev Slow Extraction Beam Test for Muon to Electron Conversion Search Experiment at J-PARC 2322
 
  • M. Tomizawa, Y. Arakaki, Y. Fukao, Y. Hashimoto, Y. Igarashi, T. Kimura, S. Mihara, M. Moritsu, S. Murasugi, R. Muto, H. Nishiguchi, K. Okamura, Y. Shirakabe, K. Ueno, E. Yanaoka
    KEK, Ibaraki, Japan
  • Y. Fujii
    Monash University, Faculty of Science, Clayton, Victoria, Australia
  • F. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
 
  A muon to electron conversion search experiment (COMET) planned at J-PARC needs 8 GeV bunched proton beams with a continuous 1 MHz pulse structure. In this experiment, an intensity ratio of the residual to the main pulsed beam, which is expressed as extinction, should be less than the level of 10-10. In RUN78 (Jan. to Feb., 2018), we have succeeded in slow extraction of 8 GeV protons with 7.3×1012 ppp, satisfies the COMET phase-I requirement, and the extinction derived from a timing measurement of secondary particles from the target shows a promising result. A mechanism to explain the measured extinction will be also described in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP010  
About • paper received ※ 01 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP045 Higher Multipoles in 3rd Integer Resonance Extraction 2437
 
  • V.P. Nagaslaev
    Fermilab, Batavia, Illinois, USA
  • K.A. Brown
    BNL, Upton, Long Island, New York, USA
  • M. Tomizawa
    KEK, Ibaraki, Japan
 
  The efficiency of slow extraction is becoming a limiting factor, as the demand for delivered beam power is constantly growing. New methods for improving extraction efficiency include folding the extraction separatrix using the higher multipoles. In this report we discuss a simple and effective approach to determine an optimal placement of those multipoles in the storage ring. This allows reduction of the beam losses and therefore, the level of prompt and residual radioactivity in the accelerator components and surrounding buildings by as much as 40% or more. We also explore here manipulating the higher order effects produced in the pure sextupole configurations for the same purpose and demonstrate that similar results can be achieved by only rearranging the sextupole magnets in the lattice.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP045  
About • paper received ※ 10 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)